The optimal number of used machines in a two-stage flexible flowshop scheduling problem

被引:13
|
作者
Gerstl, Enrique [1 ]
Mosheiov, Gur [1 ]
机构
[1] Hebrew Univ Jerusalem, Sch Business Adm, IL-91905 Jerusalem, Israel
关键词
Scheduling; Sequencing; Deterministic; Flowshop; Makespan; Flowtime; COMMON 2ND-STAGE MACHINE; 2 PART TYPES; DEDICATED MACHINES; SHOP; JOB; TIME; OPERATIONS; ALGORITHM; SELECTION;
D O I
10.1007/s10951-013-0343-z
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We study practical scheduling problems with a major decision referring to the number of machines to be used. We focus on a two-stage flexible flowshop, where each job is processed on the first (critical) machine, and then continues to one of the second-stage parallel machines. Jobs are assumed to have identical processing times, and are processed in batches. A setup time is required when starting a new batch. We consider two objective functions: minimum makespan and minimum flowtime. In both cases, a closed form expression for the optimal number of machines to be used is introduced, and a unique and unusual sequence of decreasing batch sizes is shown to be optimal.
引用
收藏
页码:199 / 210
页数:12
相关论文
共 50 条
  • [41] A TWO-STAGE SOLUTION APPROACH FOR PLASTIC INJECTION MACHINES SCHEDULING PROBLEM
    Sarac, Tugba
    Sipahioglu, Aydin
    Ozer, Emine Akyol
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2021, 17 (03) : 1289 - 1314
  • [42] Two-stage no-wait hybrid flowshop scheduling with inter-stage flexibility
    Zhong, Weiya
    Shi, Yun
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2018, 35 (01) : 108 - 125
  • [43] A two-stage three-machine assembly scheduling flowshop problem with both two-agent and learning phenomenon
    Wu, Chin-Chia
    Chen, Jia-Yang
    Lin, Win-Chin
    Lai, Kunjung
    Bai, Danyu
    Lai, Sz-Yun
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 130 : 485 - 499
  • [44] Survey and extensions of manufacturing models in two-stage flexible flow shops with dedicated machines
    Hwang, F. J.
    Lin, B. M. T.
    COMPUTERS & OPERATIONS RESEARCH, 2018, 98 : 103 - 112
  • [45] Deadlock control and hybrid social spider scheduling algorithm for two-stage assembly permutation flowshop with limited buffers
    Cao, Feng
    Feng, Yanxiang
    Wang, Siyi
    Zhang, Guanghui
    Xing, Keyi
    EXPERT SYSTEMS WITH APPLICATIONS, 2024, 245
  • [46] Two-stage assembly scheduling problem for minimizing total tardiness with setup times
    Allahverdi, Ali
    Aydilek, Harlin
    Aydilek, Asiye
    APPLIED MATHEMATICAL MODELLING, 2016, 40 (17-18) : 7796 - 7815
  • [47] A two-stage hybrid flowshop with uniform machines and setup times
    Huang, W
    Li, S
    MATHEMATICAL AND COMPUTER MODELLING, 1998, 27 (02) : 27 - 45
  • [48] Heuristic algorithms for preemptive scheduling in a two-stage flowshop with unrelated parallel machines and 0-1 resource requirements
    Figielska, Ewa
    CONTROL AND CYBERNETICS, 2009, 38 (03): : 723 - 743
  • [49] The two stage assembly flowshop scheduling problem to minimize total tardiness
    Ali Allahverdi
    Harun Aydilek
    Journal of Intelligent Manufacturing, 2015, 26 : 225 - 237
  • [50] Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint
    Yeong-Dae Kim
    Byung-Jun Joo
    Jong-Ho Shin
    Journal of Heuristics, 2009, 15 : 19 - 42