共 50 条
- [48] Heuristic algorithms for preemptive scheduling in a two-stage flowshop with unrelated parallel machines and 0-1 resource requirements CONTROL AND CYBERNETICS, 2009, 38 (03): : 723 - 743
- [49] The two stage assembly flowshop scheduling problem to minimize total tardiness Journal of Intelligent Manufacturing, 2015, 26 : 225 - 237
- [50] Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint Journal of Heuristics, 2009, 15 : 19 - 42