The optimal number of used machines in a two-stage flexible flowshop scheduling problem

被引:13
|
作者
Gerstl, Enrique [1 ]
Mosheiov, Gur [1 ]
机构
[1] Hebrew Univ Jerusalem, Sch Business Adm, IL-91905 Jerusalem, Israel
关键词
Scheduling; Sequencing; Deterministic; Flowshop; Makespan; Flowtime; COMMON 2ND-STAGE MACHINE; 2 PART TYPES; DEDICATED MACHINES; SHOP; JOB; TIME; OPERATIONS; ALGORITHM; SELECTION;
D O I
10.1007/s10951-013-0343-z
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We study practical scheduling problems with a major decision referring to the number of machines to be used. We focus on a two-stage flexible flowshop, where each job is processed on the first (critical) machine, and then continues to one of the second-stage parallel machines. Jobs are assumed to have identical processing times, and are processed in batches. A setup time is required when starting a new batch. We consider two objective functions: minimum makespan and minimum flowtime. In both cases, a closed form expression for the optimal number of machines to be used is introduced, and a unique and unusual sequence of decreasing batch sizes is shown to be optimal.
引用
收藏
页码:199 / 210
页数:12
相关论文
共 50 条
  • [21] Scheduling of a two-stage differentiation flowshop to minimize weighted sum of machine completion times
    Cheng, T. C. E.
    Lin, B. M. T.
    Tian, Y.
    COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (11) : 3031 - 3040
  • [22] TWO-STAGE HYBRID FLOWSHOP SCHEDULING PROBLEM WITH INDEPENDENT SETUP TIMES
    Jemmali, M.
    Hidri, L.
    Alourani, A.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2022, 21 (01) : 5 - 16
  • [23] Metaheuristics for Two-stage No-Wait Flexible Flow Shop Scheduling Problem
    Ghaleb, Mageed A.
    Suryahatmaja, Umar S.
    Alharkan, Ibrahim M.
    2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND OPERATIONS MANAGEMENT (IEOM), 2015,
  • [24] A two-stage flow shop batch-scheduling problem with the option of using Not-All-Machines
    Gerstl, Enrique
    Mosheiov, Gur
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 146 (01) : 161 - 166
  • [25] Two-stage flow shop scheduling with dedicated machines
    Lin, Bertrand M. T.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (04) : 1094 - 1097
  • [26] The two stage assembly flowshop scheduling problem to minimize total tardiness
    Allahverdi, Ali
    Aydilek, Harun
    JOURNAL OF INTELLIGENT MANUFACTURING, 2015, 26 (02) : 225 - 237
  • [27] Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint
    Kim, Yeong-Dae
    Joo, Byung-Jun
    Shin, Jong-Ho
    JOURNAL OF HEURISTICS, 2009, 15 (01) : 19 - 42
  • [28] A note on two-stage hybrid flowshop scheduling with missing operations
    Tseng, Chao-Tang
    Liao, Ching-Jong
    Liao, Tai-Xiang
    COMPUTERS & INDUSTRIAL ENGINEERING, 2008, 54 (03) : 695 - 704
  • [29] A two-stage flow shop scheduling problem with transportation considerations
    Chikhi, Nacira
    Abbas, Moncef
    Benmansour, Rachid
    Bekrar, Abdelghani
    Hanafi, Said
    4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2015, 13 (04): : 381 - 402
  • [30] A new heuristic for scheduling the two-stage flowshop with additional resources
    Figielska, Ewa
    COMPUTERS & INDUSTRIAL ENGINEERING, 2008, 54 (04) : 750 - 763