The optimal number of used machines in a two-stage flexible flowshop scheduling problem

被引:13
作者
Gerstl, Enrique [1 ]
Mosheiov, Gur [1 ]
机构
[1] Hebrew Univ Jerusalem, Sch Business Adm, IL-91905 Jerusalem, Israel
关键词
Scheduling; Sequencing; Deterministic; Flowshop; Makespan; Flowtime; COMMON 2ND-STAGE MACHINE; 2 PART TYPES; DEDICATED MACHINES; SHOP; JOB; TIME; OPERATIONS; ALGORITHM; SELECTION;
D O I
10.1007/s10951-013-0343-z
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We study practical scheduling problems with a major decision referring to the number of machines to be used. We focus on a two-stage flexible flowshop, where each job is processed on the first (critical) machine, and then continues to one of the second-stage parallel machines. Jobs are assumed to have identical processing times, and are processed in batches. A setup time is required when starting a new batch. We consider two objective functions: minimum makespan and minimum flowtime. In both cases, a closed form expression for the optimal number of machines to be used is introduced, and a unique and unusual sequence of decreasing batch sizes is shown to be optimal.
引用
收藏
页码:199 / 210
页数:12
相关论文
共 27 条
[1]   A survey of scheduling problems with setup times or costs [J].
Allahverdi, Ali ;
Ng, C. T. ;
Cheng, T. C. E. ;
Kovalyov, Mikhail Y. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) :985-1032
[2]   Parallel machine selection and job scheduling to minimize machine cost and job tardiness [J].
Cao, D ;
Chen, MY ;
Wan, GH .
COMPUTERS & OPERATIONS RESEARCH, 2005, 32 (08) :1995-2012
[3]   Scheduling with subcontracting options [J].
Chen, Zhi-Long ;
Li, Chung-Lun .
IIE TRANSACTIONS, 2008, 40 (12) :1171-1184
[4]   Scheduling of a two-stage differentiation flowshop to minimize weighted sum of machine completion times [J].
Cheng, T. C. E. ;
Lin, B. M. T. ;
Tian, Y. .
COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (11) :3031-3040
[5]  
Cheng TCE, 1998, INT J PROD ECON, V55, P53, DOI 10.1016/S0925-5273(98)00039-5
[6]   Batching in a two-stage flowshop with dedicated machines in the second stage [J].
Cheng, TCE ;
Kovalyov, MY ;
Chakhlevich, KN .
IIE TRANSACTIONS, 2004, 36 (01) :87-93
[7]   Batching to minimize total production time for two part types [J].
Ching, CY ;
Liao, CJ ;
Wu, CJ .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1997, 48 (01) :63-72
[8]   Scheduling unrelated parallel machines with optional machines and jobs selection [J].
Fanjul-Peyro, Luis ;
Ruiz, Ruben .
COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (07) :1745-1753
[9]   Minimizing the number of machines for minimum length schedules [J].
Finke, Gerd ;
Lemaire, Pierre ;
Proth, Jean-Marie ;
Queyranne, Maurice .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 199 (03) :702-705
[10]  
Garey M. R., 1976, Mathematics of Operations Research, V1, P117, DOI 10.1287/moor.1.2.117