Risk of Delays in Implementation of Building Investment in Urban Conditions in the Aspect of Historical Background of its Location

被引:2
作者
Apollo, Magdalena [1 ]
Grzyl, Beata [1 ]
Jakubowicz, Pawel
机构
[1] Gdansk Univ Technol, Fac Civil & Environm Engn, Gabriela Narutowicza 11-12, PL-80233 Gdansk, Poland
来源
3RD WORLD MULTIDISCIPLINARY CIVIL ENGINEERING, ARCHITECTURE, URBAN PLANNING SYMPOSIUM (WMCAUS 2018) | 2019年 / 471卷
关键词
D O I
10.1088/1757-899X/471/11/112054
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The implementation of a construction investment in urban conditions is extremely complex, and at the same time exposed to a high risk of a specific character. In case of construction investment located in the historic part of the city, the possible accumulation of many unfavourable factors, which in course of its implementation, may constitute a serious source of delays and disruptions, should be taken into account at the preparation stage of the project. Therefore, the aim of the article is to present the main factors that have a significant impact on the construction site located in the historic part of the city, i.e. they are the cause of risk in the course of works and, as a consequence, affect the time of investment implementation. On the selected example of the facility located in the historic part of Gdansk Old Town, the authors indicate the reasons for construction investment duration time extension. The authors also analyze the scope of resulting time delays between planned and actual values. The aim of the analysis is to draw investors' attention to the need of taking into account time contingency already at the preparation stage of construction investment, which results from the specific and unique nature of this type of projects. The article is a continuation of the authors' analyzes on the risk of cost overruns in implementation of building investment in urban conditions in the aspect of historical background of its location.
引用
收藏
页数:10
相关论文
共 10 条
[1]  
Abderisak A., 2015, P 19 INT S ADV CONST
[2]   ANALYSIS OF THE INCREASE OF CONSTRUCTION COSTS IN URBAN REGENERATION PROJECTS [J].
Apollo, Magdalena ;
Miszewska-Urbanska, Emilia .
ADVANCES IN SCIENCE AND TECHNOLOGY-RESEARCH JOURNAL, 2015, 9 (28) :68-74
[3]  
Bortkiewicz A., 2015, PRELIMINARY HIST CON
[4]   Construction delays in clients opinion - multivariate statistical analysis [J].
Gluszak, Michal ;
Lesniak, Agnieszka .
CREATIVE CONSTRUCTION CONFERENCE 2015, SELECTED PAPERS, 2015, 123 :182-189
[5]  
Grzyl B., 2017, IOP C SER MAT SCI EN, V245
[6]   Application of Support Vector Machine for Determination of Impact of Traffic-Induced Vibrations on Buildings [J].
Jakubczyk-Galczynska, Anna ;
Kristowski, Adam ;
Jankowski, Robert .
INTELLIGENT SYSTEMS IN PRODUCTION ENGINEERING AND MAINTENANCE (ISPEM 2017), 2018, 637 :161-167
[7]  
Lesniak A., 2010, ZESZ NAUK WSOWL, V3
[8]  
NIK, 2016, KIN4101006002014 NIK
[9]  
Sobotka A., 2011, BUDOWNICTWO I INZYNI, V2, P651
[10]   Theoretical framework of the causes of construction time and cost overruns [J].
Ullah, K. ;
Abdullah, A. H. ;
Nagapan, S. ;
Suhoo, S. ;
Khan, M. S. .
GLOBAL CONGRESS ON CONSTRUCTION, MATERIAL AND STRUCTURAL ENGINEERING 2017 (GCOMSE2017), 2017, 271