A Scenario-Based Robust Transmission Network Expansion Planning Method for Consideration of Wind Power Uncertainties

被引:51
作者
Li, Jinghua [1 ]
Ye, Liu [1 ]
Zeng, Yan [1 ]
Wei, Hua [1 ]
机构
[1] Guangxi Univ, Sch Elect Engn, Nanning 530004, Peoples R China
来源
CSEE JOURNAL OF POWER AND ENERGY SYSTEMS | 2016年 / 2卷 / 01期
关键词
Heuristic moment matching method; robust optimization; scenario generation; transmission network expansion planning; uncertainty; wind power;
D O I
10.17775/CSEEJPES.2016.00004
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This paper uses a novel scenario generation method for tackling the uncertainties of wind power in the transmission network expansion planning (TNEP) problem. A heuristic moment matching (HMM) method is first applied to generate the typical scenarios for capturing the stochastic features of wind power, including expectation, standard deviation, skewness, kurtosis, and correlation of multiple wind farms. Then, based on the typical scenarios, a robust TNEP problem is presented and formulated. The solution of the problem is robust against all the scenarios that represent the stochastic features of wind power. Three test systems are used to verify the HMM method and is compared against Taguchi's Orthogonal Array (OA) method. The simulation results show that the HMM method has better performance than the OA method in terms of the trade-off between robustness and economy. Additionally, the main factors influencing the planning scheme are studied, including the number of scenarios, wind farm capacity, and penalty factors, which provide a reference for system operators choosing parameters.
引用
收藏
页码:11 / 18
页数:8
相关论文
共 50 条
[41]   Robust transmission network expansion planning considering non-convex operational constraints [J].
Garcia-Cerezo, Alvaro ;
Baringo, Luis ;
Garcia-Bertrand, Raquel .
ENERGY ECONOMICS, 2021, 98
[42]   Integrated robust generation and transmission network expansion planning considering time duration uncertainty [J].
Bukhari, Fawzy A. ;
Alnowibet, Khalid A. .
ELECTRIC POWER SYSTEMS RESEARCH, 2025, 239
[43]   Capacity expansion planning for wind power and energy storage considering hourly robust transmission constrained unit commitment [J].
Zhou, Yuzhou ;
Zhai, Qiaozhu ;
Yuan, Wei ;
Wu, Jiang .
APPLIED ENERGY, 2021, 302
[44]   Robust Investment for Demand Response in a Distribution Network considering Wind Power and Load Demand Uncertainties [J].
Yu, Yi ;
Zhao, Nan ;
Xu, Zhao ;
Li, Jiayong ;
Wen, Xishan .
INTERNATIONAL JOURNAL OF EMERGING ELECTRIC POWER SYSTEMS, 2019, 20 (02)
[45]   Transmission Expansion Planning Based on Hybrid EDA/DE Algorithm Considering Wind Power Penetration [J].
Liu, Wenxia ;
Li, He ;
Xu, Huiting ;
Zhang, Jianhua ;
Zheng, Dehua .
2015 IEEE EINDHOVEN POWERTECH, 2015,
[46]   Load Uncertainty Based Transmission Network Expansion Planning [J].
Rathore, Chandrakant ;
Roy, Ranjit .
2013 3RD INTERNATIONAL CONFERENCE ON ELECTRIC POWER AND ENERGY CONVERSION SYSTEMS (EPECS), 2013,
[47]   A Novel Robust Energy Storage Planning Method for Grids With Wind Power Integration Considering the Impact of Hurricanes [J].
Yang, Huaizhi ;
Zhang, Cong ;
Li, Jiayong ;
Zhu, Lipeng ;
Zhou, Ke .
IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2025, 16 (02) :1388-1400
[48]   Scenario-based robust capacity planning of regional integrated energy systems considering carbon emissions [J].
Chen, Xianqing ;
Dong, Wei ;
Yang, Lingfang ;
Yang, Qiang .
RENEWABLE ENERGY, 2023, 207 :359-375
[49]   The Risk-Based Assessment of Static Voltage Stability Issues with Consideration of Load and Wind Power Uncertainties [J].
Deng, Weisi ;
Zhang, Buhan ;
Ding, Hongfa .
2015 CLEMSON UNIVERSITY POWER SYSTEMS CONFERENCE (PSC), 2015,
[50]   Transmission expansion planning based on Locational Marginal Prices and ellipsoidal approximation of uncertainties [J].
Babic, Aleksa B. ;
Saric, Andrija T. ;
Rankovic, Aleksandar .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2013, 53 :175-183