batch processing;
dynamic programming;
make-to-order production;
order acceptance policies;
customised stochastic lot scheduling problem;
DUE-DATES;
D O I:
10.1080/00207543.2012.693638
中图分类号:
T [工业技术];
学科分类号:
08 ;
摘要:
In many make-to-order production situations with batch setup times, customer orders are grouped into family-dependent batches to limit the loss of capacity due to setups. These batches, however, cannot be too large, since the make-to-order character requires that orders have to be produced in time. This trade-off between setup time efficiency and due-date adherence creates a challenging scheduling problem referred to in the literature as the Customised Stochastic Lot Scheduling Problem. Typically, suppliers reduce the complexity of the production problem by quoting lead times that are equal for all customer families. This choice, however, is in many cases too restrictive. In this paper, we show quantitatively by means of Markov decision processes (MDPs) that using family-dependent lead times can result in a significant gain in profit as compared with using standard lead times. We develop a simple heuristic acceptance/scheduling policy, and demonstrate that this heuristic performs very well compared with the optimal policy of the MDP for a wide range of parameters.
引用
收藏
页码:940 / 951
页数:12
相关论文
共 19 条
[1]
[Anonymous], 2012, Scheduling
[2]
Bertrand J W., 1990, Production control: a structural and design oriented approach
机构:
Univ Calif Los Angeles, Anderson Grad Sch Management, Los Angeles, CA 90024 USAUniv Calif Los Angeles, Anderson Grad Sch Management, Los Angeles, CA 90024 USA
Carr, S
Duenyas, I
论文数: 0引用数: 0
h-index: 0
机构:Univ Calif Los Angeles, Anderson Grad Sch Management, Los Angeles, CA 90024 USA
机构:
Univ Calif Los Angeles, Anderson Grad Sch Management, Los Angeles, CA 90024 USAUniv Calif Los Angeles, Anderson Grad Sch Management, Los Angeles, CA 90024 USA
Carr, S
Duenyas, I
论文数: 0引用数: 0
h-index: 0
机构:Univ Calif Los Angeles, Anderson Grad Sch Management, Los Angeles, CA 90024 USA