Solving a multi-objective mixed-model assembly line sequencing problem by a fuzzy goal programming approach

被引:14
作者
Javadi, Babak [2 ]
Rahimi-Vahed, Alireza [1 ]
Rabbani, Masoud
Dangchi, Mostafa
机构
[1] Univ Tehran, Dept Ind Engn, Fac Engn, Tehran, Iran
[2] Mazandaran Univ Sci & Technol, Dept Ind Engn, Babol Sar, Iran
关键词
Mixed-model assembly line; Multi-objective sequencing problem; Just-in-time; Fuzzy goal programming;
D O I
10.1007/s00170-007-1267-6
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper presents a fuzzy goal programming approach to solve a multi-objective mixed-model assembly line sequencing problem in a just-in-time production system. A mixed-model assembly line is a type of production line capable of diversified small-lot production and is able to promptly respond to sudden demand changes for a variety of models. Determining the sequence of introducing models to such an assembly line is of particular importance for the efficient implementation of just-in-time (JIT) systems. In this paper, we consider three objectives, simultaneously: minimizing total utility work, total production rate variation, and total setup cost. Because of conflicting objectives, we propose a fuzzy goal programming-based approach to solve the model. This approach is constructed based on the desirability of decision maker (DM) and tolerances considered on goal values. To illustrate the behavior of the proposed model, some of instances are solved optimally and computational results reported.
引用
收藏
页码:975 / 982
页数:8
相关论文
共 36 条
[1]  
ABDELWAHED WF, 2007, OMEGA, V34, P158
[2]   An application of fuzzy goal programming to a multiobjective project network problem [J].
Arikan, F ;
Güngör, Z .
FUZZY SETS AND SYSTEMS, 2001, 119 (01) :49-58
[3]   AN ANALYTIC FRAMEWORK FOR SEQUENCING MIXED MODEL ASSEMBLY LINES [J].
BARD, JF ;
DAREL, E ;
SHTUB, A .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1992, 30 (01) :35-48
[4]   SEQUENCING MIXED-MODEL ASSEMBLY LINES TO LEVEL PARTS USAGE AND MINIMIZE LINE LENGTH [J].
BARD, JF ;
SHTUB, A ;
JOSHI, SB .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (10) :2431-2454
[5]  
BAUTISTA J, 2007, INT J PROD IN PRESS
[6]  
Bellman R. E., 1971, Decision-making in a fuzzy environment, DOI 10.1287/mnsc.17.4.B141
[7]  
Collette Y, 2003, MULTIOBJECTIVE OPTIM
[8]   LINEAR-PROGRAMMING WITH MULTIPLE FUZZY GOALS [J].
HANNAN, EL .
FUZZY SETS AND SYSTEMS, 1981, 6 (03) :235-248
[9]  
HU CF, 2006, EUR J OPER IN PRESS
[10]   A fuzzy goal programming approach to multi-objective optimization problem with priorities [J].
Hu, Chao-Fang ;
Teng, Chang-Jun ;
Li, Shao-Yuan .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 176 (03) :1319-1333