Quantification of occupational risk owing to contact with moving parts of machines

被引:37
作者
Aneziris, O. N. [1 ]
Papazoglou, I. A. [1 ]
Konstandinidou, M. [1 ]
Baksteen, H. [2 ]
Mud, M. [3 ]
Damen, M. [4 ]
Bellamy, L. J. [5 ]
Oh, J. [6 ]
机构
[1] Natl Ctr Sci Res Demokritos, Syst Reliabil & Ind Safety Lab, Aghia Paraskevi 15310, Greece
[2] Baksteen Safety, NL-3437 RX Nieuwegein, Netherlands
[3] RPS Netherlands, NL-2628 XG Delft, Netherlands
[4] RIGO, NL-1000 CV Amsterdam, Netherlands
[5] WhiteQueen, NL-2130 AS Hoofddorp, Netherlands
[6] Minist Social Affairs & Employment, NL-2509 LV The Hague, Netherlands
关键词
Occupational risk; Moving parts; Machine; Logical model; Quantification; Importance analysis; WORM; INJURIES; SYSTEMS; SAFETY;
D O I
10.1016/j.ssci.2012.08.009
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Working population is often exposed to risks associated with moving parts of machines. In this paper a methodology for managing occupational risk owing to contact with moving parts while working with machines is presented. The methodology is based on the principles of quantified risk assessment. A logic model for contact with moving parts while working with machines has been developed under the Work-group Occupational Model (WORM) project, financed by the Dutch government and is presented in this paper. Sixty-three other models have been developed to cover different hazards in all working activities. These models allow the delineation of accidents into sequences of events describing measures (technical and/or procedural) in place to prevent them or to mitigate their consequences. Identification of these sequences enables the identification of specific root causes of such accidents and hence the determination of specific and practical actions that can influence the probability of an accident. Quantification of these models provides, furthermore, a way for assessing the relative value of such measures and hence a basis for supporting decisions aiming at reducing the consequences of accidents in the work fields. Risk has been quantified for different working situations with machines such as operating, maintaining, cleaning and clearing a machine. Qualitative information on the safety functions, measures and barriers have been derived from the analysis of 766 actual accidents occurred and reported under the Dutch law over a period of 2 years (1998-2000). A sensitivity analysis assessing the relative importance of measures affecting risk is presented and risk increase and risk decrease indices are assessed. (c) 2012 Elsevier Ltd. All rights reserved.
引用
收藏
页码:382 / 396
页数:15
相关论文
共 46 条
[1]   Quantifying occupational risk: The development of an occupational risk model [J].
Ale, B. J. M. ;
Baksteen, H. ;
Bellamy, L. J. ;
Bloemhof, A. ;
Goossens, L. ;
Hale, A. ;
Mud, M. L. ;
Oh, J. I. H. ;
Papazoglou, I. A. ;
Post, J. ;
Whiston, J. Y. .
SAFETY SCIENCE, 2008, 46 (02) :176-185
[2]  
Aneziris O.A., 2010, P ESREL 2010 REL RIS
[3]  
Aneziris O.A., 2009, P JOINT ESREL SRA EU
[4]   Towards risk assessment for crane activities [J].
Aneziris, O. N. ;
Papazoglou, I. A. ;
Mud, M. L. ;
Damen, M. ;
Kuiper, J. ;
Baksteen, H. ;
Ale, B. J. ;
Bellamy, L. J. ;
Hale, A. R. ;
Bloemhoff, A. ;
Post, J. G. ;
Oh, J. .
SAFETY SCIENCE, 2008, 46 (06) :872-884
[5]   Quantified risk assessment for fall from height [J].
Aneziris, O. N. ;
Papazoglou, I. A. ;
Baksteen, H. ;
Mud, M. ;
Ale, B. J. ;
Bellamy, L. J. ;
Hale, A. R. ;
Bloemhoff, A. ;
Post, J. ;
Oh, J. .
SAFETY SCIENCE, 2008, 46 (02) :198-220
[6]   Occupational risk of building construction [J].
Aneziris, O. N. ;
Topali, E. ;
Papazoglou, I. A. .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2012, 105 :36-46
[7]   Occupational risk of tunneling construction [J].
Aneziris, O. N. ;
Papazoglou, I. A. ;
Kallianiotis, D. .
SAFETY SCIENCE, 2010, 48 (08) :964-972
[8]   Assessment of occupational risks in an aluminium processing industry [J].
Aneziris, O. N. ;
Papazoglou, I. A. ;
Doudakmani, O. .
INTERNATIONAL JOURNAL OF INDUSTRIAL ERGONOMICS, 2010, 40 (03) :321-329
[9]  
[Anonymous], 2008, 10371995A1 EN
[10]  
[Anonymous], 2002, FAULT TREE HDB AEROS