A new mathematical programming model for long-term production scheduling considering geological uncertainty

被引:0
|
作者
Gholamnejad, J. [1 ]
Moosavi, E. [2 ]
机构
[1] Yazd Univ, Dept Min & Met Engn, Yazd, Iran
[2] Islamic Azad Univ, Dept Min Engn, Tehran, Iran
关键词
open pit mine; long-term production scheduling; integer programming; geological uncertainty; DESIGN; RISK;
D O I
暂无
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
Determination of the optimum production schedules over the life of a mine is a critical mechanism in open pit mine planning procedures. Long-term production scheduling is used to maximize the net present value of the project under technical, financial, and environmental constraints. Mathematical programming models are well suited for optimizing long-term production schedules of open pit mines. There are two approaches to solving long-term production problems: deterministic- and uncertainty- based approaches. Deterministic-based models are unable to deal with grade and geological uncertainties, which are two important sources of risk in mining industries. This may lead to discrepancies between actual production obtained by these algorithms and planning expectations. In this paper, a new binary integer programming model was developed for long-term production scheduling that incorporates geological uncertainty within the orebody. Then, traditional and uncertainty-based models are applied to an iron ore deposit. Results showed that the uncertainty-based approach yields more practical schedules than traditional approaches in terms of production targets.
引用
收藏
页码:77 / 81
页数:5
相关论文
共 50 条
  • [21] Stochastic optimisation of long-term block cave scheduling with hang-up and grade uncertainty
    Dirkx, Rein
    Kazakidis, Vassilios
    Dimitrakopoulos, Roussos
    INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT, 2019, 33 (06) : 371 - 388
  • [22] Risk explicit interval linear programming model for long-term planning of vehicle recycling in the EU legislative context under uncertainty
    Simic, Vladimir
    Dimitrijevic, Branka
    RESOURCES CONSERVATION AND RECYCLING, 2013, 73 : 197 - 210
  • [23] Incorporating Operational Modes into long-Term Open-Pit Mine Planning Under Geological Uncertainty: An Optimization Combining Variable Neighborhood Descent with Linear Programming
    Quelopana, Aldo
    Navarra, Alessandro
    MINING METALLURGY & EXPLORATION, 2024, : 2769 - 2782
  • [24] Optimising the mine production scheduling accounting for stockpiling and investment decisions under geological uncertainty
    Brika, Zeyneb
    Gamache, Michel
    Dimitrakopoulos, Roussos
    INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT, 2023, 37 (05) : 355 - 374
  • [25] A Comprehensive Study of Several Meta-Heuristic Algorithms for Open-Pit Mine Production Scheduling Problem Considering Grade Uncertainty
    Tolouei, K.
    Moosavi, E.
    Tabrizi, A. H. Bangian
    Afzal, P.
    Bazzazi, A. Aghajani
    JOURNAL OF MINING AND ENVIRONMENT, 2020, 11 (03): : 721 - 736
  • [26] Development of an intelligent evolution algorithm for open pit mines' long-term production scheduling using the concept of block aggregation
    Azadi, Nooshin
    Mirzaei-Nasirabad, Hossein
    MINING TECHNOLOGY-TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY, 2024, 133 (03) : 257 - 275
  • [27] Optimization of underground mining production layouts considering geological uncertainty using deep reinforcement learning
    Noriega, Roberto
    Boisvert, Jeff
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2025, 139
  • [28] Lower Bound Uncertainty and Long-Term Interest Rates
    Grisse, Christian
    JOURNAL OF MONEY CREDIT AND BANKING, 2023, 55 (2-3) : 619 - 634
  • [29] A Multi-Stage Methodology for Long-Term Open-Pit Mine Production Planning under Ore Grade Uncertainty
    Jelvez, Enrique
    Ortiz, Julian
    Varela, Nelson Morales
    Askari-Nasab, Hooman
    Nelis, Gonzalo
    MATHEMATICS, 2023, 11 (18)
  • [30] PRESENTING A MATHEMATICAL PROGRAMMING MODEL FOR ROUTING AND SCHEDULING OF CROSS-DOCK AND TRANSPORTATION
    Tavallali, P. A.
    Feylizadeh, M. R.
    Amindoust, A.
    POLISH JOURNAL OF MANAGEMENT STUDIES, 2020, 22 (01): : 545 - 564