A new mathematical programming model for long-term production scheduling considering geological uncertainty

被引:0
|
作者
Gholamnejad, J. [1 ]
Moosavi, E. [2 ]
机构
[1] Yazd Univ, Dept Min & Met Engn, Yazd, Iran
[2] Islamic Azad Univ, Dept Min Engn, Tehran, Iran
关键词
open pit mine; long-term production scheduling; integer programming; geological uncertainty; DESIGN; RISK;
D O I
暂无
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
Determination of the optimum production schedules over the life of a mine is a critical mechanism in open pit mine planning procedures. Long-term production scheduling is used to maximize the net present value of the project under technical, financial, and environmental constraints. Mathematical programming models are well suited for optimizing long-term production schedules of open pit mines. There are two approaches to solving long-term production problems: deterministic- and uncertainty- based approaches. Deterministic-based models are unable to deal with grade and geological uncertainties, which are two important sources of risk in mining industries. This may lead to discrepancies between actual production obtained by these algorithms and planning expectations. In this paper, a new binary integer programming model was developed for long-term production scheduling that incorporates geological uncertainty within the orebody. Then, traditional and uncertainty-based models are applied to an iron ore deposit. Results showed that the uncertainty-based approach yields more practical schedules than traditional approaches in terms of production targets.
引用
收藏
页码:77 / 81
页数:5
相关论文
共 50 条
  • [1] A new mathematical programming model for long-term production scheduling considering geological uncertainty
    Department of Mining and Metallurgy Engineering, Yazd University, Yazd, Iran
    不详
    SAIMM J S Afr Inst Min Metall, 2012, 2 (77-81):
  • [2] Long-Term Scheduling of Cascade Reservoirs Considering Inflow Forecasting Uncertainty Based on a Disaggregation Model
    Ding, Xiaoling
    Mo, Xiaocong
    Zhou, Jianzhong
    Bi, Sheng
    Jia, Benjun
    Liao, Xiang
    WATER RESOURCES MANAGEMENT, 2021, 35 (02) : 645 - 660
  • [3] Long-Term Scheduling of Cascade Reservoirs Considering Inflow Forecasting Uncertainty Based on a Disaggregation Model
    Xiaoling Ding
    Xiaocong Mo
    Jianzhong Zhou
    Sheng Bi
    Benjun Jia
    Xiang Liao
    Water Resources Management, 2021, 35 : 645 - 660
  • [4] Optimisation of long-term quarry production scheduling under geological uncertainty to supply raw materials to a cement plant
    Vu, Trong
    Bao, Tran
    Drebenstedt, Carsten
    Pham, Hien
    Nguyen, Hoai
    Nguyen, Duc
    MINING TECHNOLOGY-TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY, 2021, 130 (03) : 146 - 158
  • [5] Long-term production scheduling modeling for the open pit mines considering tonnage uncertainty via indicator kriging
    E. Moosavi
    J. Gholamnejad
    Journal of Mining Science, 2015, 51 : 1226 - 1234
  • [6] Long-term production scheduling modeling for the open pit mines considering tonnage uncertainty via indicator kriging
    Moosavi, E.
    Gholamnejad, J.
    JOURNAL OF MINING SCIENCE, 2015, 51 (06) : 1226 - 1234
  • [7] Stochastic long-term production scheduling of iron ore deposits: Integrating joint multi-element geological uncertainty
    J. Benndorf
    R. Dimitrakopoulos
    Journal of Mining Science, 2013, 49 : 68 - 81
  • [8] Stochastic long-term production scheduling of iron ore deposits: Integrating joint multi-element geological uncertainty
    Benndorf, J.
    Dimitrakopoulos, R.
    JOURNAL OF MINING SCIENCE, 2013, 49 (01) : 68 - 81
  • [9] Underground long-term mine production scheduling with integrated geological risk management
    Carpentier, S.
    Gamache, M.
    Dimitrakopoulos, R.
    TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2016, 125 (02): : 93 - 102
  • [10] A stochastic particle swarm based model for long term production planning of open pit mines considering the geological uncertainty
    Gilani, Seyyed-Omid
    Sattarvand, Javad
    Hajihassani, Mohsen
    Abdullah, Shahrum Shah
    RESOURCES POLICY, 2020, 68