CRACK SHAPE DEVELOPMENT FOR LEAK-BEFORE-BREAK ANALYSIS IN PIPELINES

被引:0
作者
Zhang, Kathy [1 ]
Xu, Luyao [1 ]
Ferguson, James [1 ]
Zadery, Dennis [1 ]
机构
[1] Stantec Consulting Ltd, Calgary, AB, Canada
来源
PROCEEDINGS OF THE 12TH INTERNATIONAL PIPELINE CONFERENCE, 2018, VOL 1 | 2018年
关键词
pipeline; leak-before-break; fatigue growth; crack aspect ratio; PIPE;
D O I
暂无
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
Surface cracks in pipelines under certain service conditions may grow due to fatigue, which is caused by pressure (cycles). The leak-before-break (LBB) assessment method is employed to avoid any catastrophic failure prior to a detectable leakage. In the LBB analysis, crack critical length is an essential element for determining the pipeline leak or rupture. The common approach regarding the evaluation of LBB is to calculate the critical crack length and through-wall length under iven pressure cycling conditions. If the critical crack length is less than the through-wall length, LBB conditions could occur and be detected if leak detection capability is high. This involves complex calculations in crack fatigue growth and could result in extensive analysis if thepipeline has a large crack population. This paper presents a simplified approach for assessing the leak-before-break of the flawed pipelines. This approach is based on industrial code API 579-1/ASME FFS-1 Fitness-For Service. Through the investigation of effects for different parameters on crack growth, including crack initial geometry, pipeline materials, loading conditions, pipeline diameter and wall thickness, it was determined that the crack initial aspect ratio is a major factor influencing crack growth and geometry evolution. Based on these parameters, a crack fatigue growth map was developed. By comparing the behaviors of different cases, it was confirmed that the proposed method is a valid approach for the pipeline LBB analysis.
引用
收藏
页数:9
相关论文
共 22 条
[1]   A LEAK-BEFORE-BREAK STRATEGY FOR CANDU PRIMARY PIPING SYSTEMS [J].
AGGARWAL, ML ;
KOZLUK, MJ ;
LIN, TC ;
MANNING, BW ;
VIJAY, DK .
INTERNATIONAL JOURNAL OF PRESSURE VESSELS AND PIPING, 1986, 25 (1-4) :239-256
[2]  
Anderson T.L., Fracture mechanics: fundamentals and applications 2017, VThird
[3]  
[Anonymous], RHR6REV4 CEGB
[4]  
[Anonymous], 2013, 7910 BS
[5]  
[Anonymous], 2017, E1049 ASTM INT
[6]  
[Anonymous], 2017, SIGNAL FITNESS FOR S
[7]  
[Anonymous], 2016, API 579-1/ASME FFS-1
[8]   LEAK-BEFORE-BREAK BEHAVIOR OF NUCLEAR PIPING SYSTEMS [J].
BARTHOLOME, G ;
WELLEIN, R .
THEORETICAL AND APPLIED FRACTURE MECHANICS, 1995, 23 (02) :145-149
[9]  
Bourga R., 2015, INT J PRESSURE VESSE, V49, P129
[10]  
European Commission, 2000, Report EUR18549 EN