Forecasting Time between Problems of Building Components by Using BIM

被引:0
|
作者
Matsubayashi, Michio [1 ]
Watanabe, Shun [1 ]
机构
[1] Univ Tsukuba, Fac Engn, Grad Sch Syst & Informat Engn, Tsukuba, Ibaraki 305, Japan
关键词
BIM; FM; Existing building; Repair record; Regression analysis;
D O I
10.3311/CAADence.1637
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Because the conservation of buildings constructed during Japan's period of high economic growth is now an urgent problem, this paper reports on the development of a method of forecasting the time between problems of building components that integrates building information modeling (BIM) data and building repair records in order to enable more effective and strategic facilities management. In addition, because numerous buildings and facilities are suffering from worker shortages, thus making efficient management and maintenance essential, it is necessary to gain an understanding of how the conditions of components in a building change over time. To that end, building models were created using building blueprints and BIM data was extracted, which was then used in our calculations. Attempts were also made to calculate time between problems of building components via multiple regression analysis. In this process, explanatory variables were collected from BIM and repair record data.
引用
收藏
页码:87 / 92
页数:6
相关论文
共 50 条
  • [41] Impacts of Using Building Information Modelling (BIM) in Sustainable Green Building Projects
    Gurgun, Asli Pelin
    Koc, Kerim
    Atabay, Senay
    TEKNIK DERGI, 2022, 33 (03): : 11857 - 11886
  • [42] OPTIMIZING ENERGY CONSUMPTION IN BUILDING DESIGNS USING BUILDING INFORMATION MODEL (BIM)
    Egwunatum, Samuel
    Joseph-Akwara, Esther
    Akaigwe, Richard
    SLOVAK JOURNAL OF CIVIL ENGINEERING, 2016, 24 (03) : 19 - 28
  • [43] INTEGRATING DECISION SUPPORT SYSTEM (DSS) AND BUILDING INFORMATION MODELING (BIM) TO OPTIMIZE THE SELECTION OF SUSTAINABLE BUILDING COMPONENTS
    Jalaei, Farzad
    Jrade, Ahmad
    Nassiri, Mahtab
    JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2015, 20 : 399 - 420
  • [44] Interoperability between BIM and building energy modelling - a case study
    Asdrubali, Francesco
    Manzo, Manuel
    Grazieschi, Gianluca
    PROCEEDINGS OF BUILDING SIMULATION 2021: 17TH CONFERENCE OF IBPSA, 2022, 17 : 2063 - 2069
  • [45] Retrofitting of building components using Building Information Modelling for sustainability
    Sohail, Mahnoor Fatima
    Shahid, Saman
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-ENGINEERING SUSTAINABILITY, 2025,
  • [46] Inverse Forecasting Problems of Time Series in the Harmonic Basis
    Balyk, V. M.
    Balyk, E., V
    Thuong, N. Q.
    Osadchuk, M. A.
    INTERNATIONAL JOURNAL OF APPLIED MATHEMATICS & STATISTICS, 2019, 58 (04): : 86 - 100
  • [47] Indoor Positioning using Time Difference of Arrival between Multipath Components
    Gentner, Christian
    Jost, Thomas
    2013 INTERNATIONAL CONFERENCE ON INDOOR POSITIONING AND INDOOR NAVIGATION (IPIN), 2013,
  • [48] A review on time series forecasting techniques for building energy consumption
    Deb, Chirag
    Zhang, Fan
    Yang, Junjing
    Lee, Siew Eang
    Shah, Kwok Wei
    RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2017, 74 : 902 - 924
  • [49] A new approach for handling forecasting problems using high-order fuzzy time series
    Chen, Shyi-Ming
    INTELLIGENT AUTOMATION AND SOFT COMPUTING, 2008, 14 (01): : 29 - 43
  • [50] Forecasting electricity prices and their volatilities using Unobserved Components
    Garcia-Martos, Carolina
    Rodriguez, Julio
    Jesus Sanchez, Maria
    ENERGY ECONOMICS, 2011, 33 (06) : 1227 - 1239