Forecasting Time between Problems of Building Components by Using BIM

被引:0
|
作者
Matsubayashi, Michio [1 ]
Watanabe, Shun [1 ]
机构
[1] Univ Tsukuba, Fac Engn, Grad Sch Syst & Informat Engn, Tsukuba, Ibaraki 305, Japan
关键词
BIM; FM; Existing building; Repair record; Regression analysis;
D O I
10.3311/CAADence.1637
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Because the conservation of buildings constructed during Japan's period of high economic growth is now an urgent problem, this paper reports on the development of a method of forecasting the time between problems of building components that integrates building information modeling (BIM) data and building repair records in order to enable more effective and strategic facilities management. In addition, because numerous buildings and facilities are suffering from worker shortages, thus making efficient management and maintenance essential, it is necessary to gain an understanding of how the conditions of components in a building change over time. To that end, building models were created using building blueprints and BIM data was extracted, which was then used in our calculations. Attempts were also made to calculate time between problems of building components via multiple regression analysis. In this process, explanatory variables were collected from BIM and repair record data.
引用
收藏
页码:87 / 92
页数:6
相关论文
共 50 条
  • [21] Time series forecasting method of building energy consumption using support vector regression
    Liu, Dandan
    Chen, Qijun
    Mori, Kazuyuki
    2015 IEEE INTERNATIONAL CONFERENCE ON INFORMATION AND AUTOMATION, 2015, : 1628 - 1632
  • [22] Optimising building sustainability assessment using BIM
    Carvalho, Jose Pedro
    Braganca, Luis
    Mateus, Ricardo
    AUTOMATION IN CONSTRUCTION, 2019, 102 : 170 - 182
  • [23] Strategies in using Building Information Modeling(BIM) to solve Problems in Project Management of Chinese Construction Enterprises
    Shen, Li
    Lin, Yaxing
    ADVANCES IN CIVIL AND STRUCTURAL ENGINEERING III, PTS 1-4, 2014, 501-504 : 2700 - 2705
  • [24] Interoperability between Building Information Modelling (BIM) and Building Energy Model (BEM)
    Bastos Porsani, Gabriela
    Del Valle de Lersundi, Kattalin
    Sanchez-Ostiz Gutierrez, Ana
    Fernandez Bandera, Carlos
    APPLIED SCIENCES-BASEL, 2021, 11 (05): : 1 - 20
  • [25] Forecasting supply chain components with time series analysis
    Martin, LJ
    Frei, J
    53RD ELECTRONIC COMPONENTS & TECHNOLOGY CONFERENCE, 2003 PROCEEDINGS, 2003, : 269 - 278
  • [26] Real-time solar PV generation in a building using LSTM-based time series forecasting
    C. Nithya
    J. Preetha Roselyn
    D. Devaraj
    Discover Electronics, 1 (1):
  • [27] Forecasting and imitating of human evacuation time in building fire
    Xiao, GQ
    Wen, LM
    Chen, BZ
    PROCEEDINGS IN MINING SCIENCE AND SAFETY TECHNOLOGY, 2002, : 341 - 343
  • [28] A BIM-based semantic approach for fund-allocation of building components
    Mohamed, Ahmed Gouda
    Marzouk, Mohamed
    ARCHITECTURAL ENGINEERING AND DESIGN MANAGEMENT, 2024, 20 (03) : 471 - 493
  • [29] Building Information Modeling (BIM) of Coke-Plant Components in Giprokoks Designs
    A. M. Kravchenko
    M. P. Hryhorenko
    Coke and Chemistry, 2019, 62 : 306 - 313
  • [30] Building Information Modeling (BIM) of Coke-Plant Components in Giprokoks Designs
    Kravchenko, A. M.
    Hryhorenko, M. P.
    COKE AND CHEMISTRY, 2019, 62 (07) : 306 - 313