Single-Machine Scheduling with Due-Window Assignment and Rate-Modifying-Activities under a Deteriorating Maintenance

被引:1
|
作者
Luo, Chengxin [1 ]
机构
[1] Shenyang Normal Univ, Sch Math & Syst Sci, Shenyang 110034, Peoples R China
来源
ADVANCES IN MECHATRONICS AND CONTROL ENGINEERING, PTS 1-3 | 2013年 / 278-280卷
关键词
Scheduling; Due-Window Assignment; Rate-Modifying Activity; Maintenance Activity; SUBJECT; JOBS;
D O I
10.4028/www.scientific.net/AMM.278-280.2248
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper studies single-machine scheduling problems with a due-window assignment and a rate-modifying activity under a deteriorating maintenance consideration simultaneously. Jobs completed within the due-window incur no penalties, other jobs incur either earliness or tardiness penalties. The maintenance activity can be scheduled immediately after any one of the completed jobs. We assume that once the maintenance activity has been completed, the machine efficiency will be improved and the machine maintenance duration depends on its starting time. The objective is to find the optimal maintenance position as well as the optimal size and location of the due-window, and the sequence of jobs to minimize a cost function based on the window size and window location and the earliness and tardiness of the jobs. We propose a polynomial time algorithm to solve the problem optimally.
引用
收藏
页码:2248 / 2251
页数:4
相关论文
共 50 条
  • [21] Scheduling a maintenance activity and due-window assignment based on common flow allowance
    Mor, Baruch
    Mosheiov, Gur
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2012, 135 (01) : 222 - 230
  • [22] Machine scheduling problems under deteriorating effects and deteriorating rate-modifying activities
    Zhang, Xingong
    Wu, Wen-Hsiang
    Lin, Win-Chin
    Wu, Chin-Chia
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2018, 69 (03) : 439 - 448
  • [23] Due-window assignment scheduling problems with position-dependent weights on a single machine
    Wang, Ji-Bo
    Zhang, Bo
    Li, Lin
    Bai, Danyu
    Feng, Yu-Bo
    ENGINEERING OPTIMIZATION, 2020, 52 (02) : 185 - 193
  • [24] Single-machine scheduling with deteriorating effects and machine maintenance
    Sun, Xinyu
    Geng, Xin-Na
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (10) : 3186 - 3199
  • [25] Slack Due-Window Assignment Scheduling Problem with Deterioration Effects and a Deteriorating Maintenance Activity
    Jia, Xue
    Lv, Dan-Yang
    Hu, Yang
    Wang, Ji-Bo
    Wang, Zhi
    Wang, Ershen
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2022, 39 (06)
  • [26] Single-Machine Due-Window Assignment and Scheduling with Learning Effect and Resource-Dependent Processing Times
    Wang, Ji-Bo
    Wang, Ming-Zheng
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2014, 31 (05)
  • [27] Minmax Common Due-Window Assignment Scheduling with Deteriorating Jobs
    Lv, Dan-Yang
    Xue, Jing
    Wang, Ji-Bo
    JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF CHINA, 2024, 12 (03) : 681 - 693
  • [28] Single-machine scheduling and slack due-date assignment with aging effect and deteriorating maintenance
    Suh-Jenq Yang
    Chou-Jung Hsu
    Dar-Li Yang
    Optimization Letters, 2012, 6 : 1855 - 1873
  • [29] Single-machine batch delivery scheduling and common due-date assignment with a rate-modifying activity
    Yin, Yunqiang
    Cheng, T. C. E.
    Wu, Chin-Chia
    Cheng, Shuenn-Ren
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (19) : 5583 - 5596
  • [30] An optimal single-machine scheduling with linear deterioration rate and rate-modifying activities
    Yu, Sheng
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2015, 30 (02) : 242 - 252