Dynamic Assessment Model of Construction Safety Management Based on SPA and Markov Chain

被引:0
作者
Chen, Shunliang [1 ]
Huang, Qing [2 ]
Guo, Jingyuan [1 ]
机构
[1] Cent S Univ Forestry & Technol, Changsha, Hunan, Peoples R China
[2] Hunan Licha Highway Construct & Dev Co LTD, Zhuzhou, Peoples R China
来源
ADVANCES IN STRUCTURAL ENGINEERING, PTS 1-3 | 2011年 / 94-96卷
关键词
Set Pair Analysis (SPA); Markov Chain; Connection Degree; Dynamic Assessment; Safty Management;
D O I
10.4028/www.scientific.net/AMM.94-96.2345
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
the set pair analysis method that deal with uncertain problem of system and Markov chain theory that research the transition law of system state was appled to establish the dynamic assessment model for safety management of bridge construction. Taking a bridge construction project as an example, this paper conduct a dynamic assessment through five time intervals and come to a conclusion that the assessment results are general and they need rectification, but the system state is developing into a favourable level. And the evaluate results verify the rationality of the model.
引用
收藏
页码:2345 / +
页数:2
相关论文
共 9 条
  • [1] Dynamic safety analysis of process systems with an application to a cryogenic ammonia storage tank
    Aneziris, ON
    Papazoglou, IA
    Lygerou, V
    [J]. JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2000, 13 (02) : 153 - 165
  • [2] Curnow RN, 1988, THEOR BIOL, V134, P51
  • [3] Harper Randall S., 1998, J CONSTR ENG M ASCE, P452
  • [4] Liu Yejiao, 2009, COAL ENG, P119
  • [5] Song Lianjun, 2009, ELECT POWER AUTOMATI, V29, P38
  • [6] SU YK, 2003, J JLAMUSI U, V21, P383
  • [7] Safety management: Problems encountered and recommended solutions
    Wilson, JM
    Koehn, E
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2000, 126 (01): : 77 - 79
  • [8] Zhao Lifeng, 1998, THEORIES METHODS ITS, P61
  • [9] Zhou Jiahong, 2008, J NE U NATURAL SCI, V29, P417