Comparison of two methods of operating theatre planning: Application in Belgian Hospital

被引:23
作者
Chaabane, Sondes [1 ]
Meskens, Nadine [2 ]
Guinet, Alain [3 ]
Laurent, Marius [4 ]
机构
[1] Univ Valenciennes, LAMIH Lab, F-59313 Valenciennes 09, France
[2] FUCAM, MAAD Lab, B-7000 Mons, Belgium
[3] Inst Natl Sci Appl, LIESP Lab, F-69621 Villeurbanne, France
[4] CHU TIVOLI, B-7100 La Louviere, Belgium
关键词
open scheduling; block scheduling; operating theatre planning; master surgical schedule;
D O I
10.1007/s11518-008-5074-x
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Operating Theatre is the centre of the hospital management's efforts. It constitutes the most expensive sector with more than 10% of the intended operating budget of the hospital. To reduce the costs while maintaining a good quality of care, one of the solutions is to improve the existent planning and scheduling methods by improving the services and surgical specialty coordination or finding the best estimation of surgical case durations. The other solution is to construct an effective surgical case plan and schedule. The operating theatre planning and scheduling is the two important steps, which aim to make a surgical case programming with an objective of obtaining a realizable and efficient surgical case schedule. This paper focuses on the first step, the operating theatre planning problem. Two planning methods are introduced and compared. Real data of a Belgian university hospital "Tivoli" are used for the experiments.
引用
收藏
页码:171 / 186
页数:16
相关论文
共 21 条
[1]  
CHAABANE S, 2004, THESIS I NATL SCI AP
[2]  
COMBES C, 2005, IESM 2005
[3]   Which algorithm for scheduling add-on elective cases maximizes operating room utilization? Use of bin packing algorithms and fuzzy constraints in operating room management [J].
Dexter, F ;
Macario, A ;
Traub, RD .
ANESTHESIOLOGY, 1999, 91 (05) :1491-1500
[4]   Use of linear programming to estimate impact of changes in a hospital's operating room time allocation on perioperative variable costs [J].
Dexter, F ;
Blake, JT ;
Penning, DH ;
Sloan, B ;
Chung, P ;
Lubarsky, DA .
ANESTHESIOLOGY, 2002, 96 (03) :718-724
[5]   Decrease in case duration required to complete an additional case during regularly scheduled hours in an operating room suite: A computer simulation study [J].
Dexter, F ;
Macario, A .
ANESTHESIA AND ANALGESIA, 1999, 88 (01) :72-76
[6]  
DEXTER F, 1999, ASA NEWSLETTER, V62, P6
[7]  
GORDON T, 1988, Journal of Medical Systems, V12, P169, DOI 10.1007/BF00996639
[8]   Operating theatre planning [J].
Guinet, A ;
Chaabane, S .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2003, 85 (01) :69-81
[9]  
HAMMAMI S, 2004, C MOD SIM MOSIM2004
[10]  
*HLTH FIN MAN ASS, 2003, HLTH FINANCIAL MAN S, V57, P112