An Approximation Scheme for Heterogeneous Parallel Task Scheduling in a Two-Stage Hybrid Flow Shop

被引:0
作者
Sun, Jinghao [1 ]
Meng, Yakun [1 ]
机构
[1] Northeastern Univ, Sch Informat Sci & Engn, Shenyang 110004, Peoples R China
关键词
hybrid flow shop; scheduling; heterogeneous parallel tasks; approximation scheme; worst-case analysis; MULTIPROCESSOR TASKS; ALGORITHM;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Motivated by applications in cyber-physical systems (CPS), this paper introduces a two-stage hybrid flow shop with heterogeneous parallel tasks for minimizing makespan. There is only one processor for the first stage and m identical parallel processors for the second stage. Each task consists of several operations where the first operation executed at the first stage and afterwards the other operations with different processing time which can be executed concurrently at the second stage. The problem is proved to be NP-hard in the strong sense even when m = 2 and each task consists of only one operation at the second stage. To deal with the intractable problem, we first equivalently cast it to a two-stage multiprocessor schedule problem with clustered tasks. Then we show that the search for an optimal solution of the latter problem may be restricted to the schedules that execute the first-stage operations of each task cluster in a chain. Finally, we demonstrate the existence of an approximation scheme for this problem with a worst-case ratio bound of 1 + epsilon and a running time polynomial in 1/epsilon.
引用
收藏
页码:1291 / 1308
页数:18
相关论文
共 50 条
  • [21] Outsourcing and production scheduling for a two-stage flow shop
    Qi, Xiangtong
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2011, 129 (01) : 43 - 50
  • [22] A fully polynomial time approximation scheme for scheduling on parallel identical two-stage openshops
    Jianming Dong
    Ruyan Jin
    Jueliang Hu
    Guohui Lin
    Journal of Combinatorial Optimization, 2019, 37 : 668 - 684
  • [23] Scheduling in aerospace composite manufacturing systems: a two-stage hybrid flow shop problem
    Aria Azami
    Kudret Demirli
    Nadia Bhuiyan
    The International Journal of Advanced Manufacturing Technology, 2018, 95 : 3259 - 3274
  • [24] A branch-and-bound algorithm for two-stage no-wait hybrid flow-shop scheduling
    Wang, Shijin
    Liu, Ming
    Chu, Chengbin
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (04) : 1143 - 1167
  • [25] Scheduling in aerospace composite manufacturing systems: a two-stage hybrid flow shop problem
    Azami, Aria
    Demirli, Kudret
    Bhuiyan, Nadia
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2018, 95 (9-12) : 3259 - 3274
  • [26] A two-stage flow shop scheduling problem with transportation considerations
    Nacira Chikhi
    Moncef Abbas
    Rachid Benmansour
    Abdelghani Bekrar
    Saïd Hanafi
    4OR, 2015, 13 : 381 - 402
  • [27] Exact resolution of the two-stage hybrid flow shop with dedicated machines
    Hatem Hadda
    Najoua Dridi
    Sonia Hajri-Gabouj
    Optimization Letters, 2014, 8 : 2329 - 2339
  • [28] A note on the two-stage hybrid flow shop problem with dedicated machines
    Hatem Hadda
    Najoua Dridi
    Sonia Hajri-Gabouj
    Optimization Letters, 2012, 6 : 1731 - 1736
  • [29] A note on the two-stage hybrid flow shop problem with dedicated machines
    Hadda, Hatem
    Dridi, Najoua
    Hajri-Gabouj, Sonia
    OPTIMIZATION LETTERS, 2012, 6 (08) : 1731 - 1736
  • [30] Exact resolution of the two-stage hybrid flow shop with dedicated machines
    Hadda, Hatem
    Dridi, Najoua
    Hajri-Gabouj, Sonia
    OPTIMIZATION LETTERS, 2014, 8 (08) : 2329 - 2339