Stochastic programming approach for unidirectional quay crane scheduling problem with uncertainty

被引:17
|
作者
Ma, Shoufeng [1 ]
Li, Hongming [1 ]
Zhu, Ning [1 ]
Fu, Chenyi [1 ]
机构
[1] Tianjin Univ, Inst Syst Engn, Coll Management & Econ, Tianjin 300072, Peoples R China
基金
中国国家自然科学基金;
关键词
Unidirectional quay crane scheduling; Uncertainty; Two-stage stochastic programming; Integer L-shaped method; Simulated annealing algorithm; GENETIC ALGORITHM; BERTH ALLOCATION; LINEAR-PROGRAMS; OPTIMIZATION; 1ST-STAGE; BRANCH;
D O I
10.1007/s10951-020-00661-8
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Quay crane scheduling is a key aspect of container terminal operation, which can be regarded as a decision-making process with uncertainty. Each task involves stochastic loading and unloading operation times owing to the existence of uncertainty. In this study, we investigate the unidirectional quay crane scheduling problem for a stochastic processing time, which requires that all the quay cranes move in the same direction either from bow to stern, or vice versa, throughout the planning horizon. The problem is formulated as a two-stage stochastic mixed-integer programming model, where the binary first-stage decision variables correspond to the assignment of tasks to quay cranes, and the mixed-integer second-stage decision variables are related to the generation of detailed schedules. To make the model solvable, we develop an alternative equivalent reformulation with a special structure that involves binary variables in the first stage and continuous variables in the second stage. To solve this reformulated model, an integer L-shaped method is presented for small-size instances, and a simulated annealing algorithm is presented for large-size instances to obtain near-optimal solutions. Numerical experiments show that the integer L-shaped method and simulated annealing algorithm could efficiently solve the unidirectional quay crane scheduling problem with uncertainty. The results also indicate that the stochastic model has distinct advantages in terms of shortening the completion time of vessels and improving the service level of container terminals compared with the expected value problem solutions.
引用
收藏
页码:137 / 174
页数:38
相关论文
共 50 条
  • [1] Stochastic programming approach for unidirectional quay crane scheduling problem with uncertainty
    Shoufeng Ma
    Hongming Li
    Ning Zhu
    Chenyi Fu
    Journal of Scheduling, 2021, 24 : 137 - 174
  • [2] Constraint programming approach to quay crane scheduling problem
    Unsal, Ozgur
    Oguz, Ceyda
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2013, 59 : 108 - 122
  • [3] A Proactive Approach for Simultaneous Berth and Quay Crane Scheduling Problem with Stochastic Handling Time
    Han, Xiao-le
    Lu, Zhi-qiang
    Xi, Li-feng
    CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 74 - 79
  • [4] A quay crane scheduling problem: a heuristic approach
    Yang, Kang-hung
    PROCEEDINGS OF THE FOURTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2010, : 254 - 258
  • [5] A proactive approach for simultaneous berth and quay crane scheduling problem with stochastic arrival and handling time
    Han, Xiao-le
    Lu, Zhi-qiang
    Xi, Li-feng
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 207 (03) : 1327 - 1340
  • [6] Optimisation for quay crane scheduling problem under uncertainty using PSO and OCBA
    Hu, Hongtao
    Chen, Xiazhong
    Zhang, Si
    INTERNATIONAL JOURNAL OF SHIPPING AND TRANSPORT LOGISTICS, 2019, 11 (2-3) : 196 - 215
  • [7] Berth allocation and quay crane assignment/scheduling problem under uncertainty: A survey
    Rodrigues, Filipe
    Agra, Agostinho
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 303 (02) : 501 - 524
  • [8] Decomposition algorithms for the robust unidirectional quay crane scheduling problems
    Li, Yitian
    Li, Xinyi
    Zhang, Canrong
    Wu, Tao
    COMPUTERS & OPERATIONS RESEARCH, 2024, 167
  • [9] The Influence of the Quay Crane Traveling Time for the Quay Crane Scheduling Problem
    Yang, Kong-hung
    INTERNATIONAL MULTICONFERENCE OF ENGINEERS AND COMPUTER SCIENTIST, IMECS 2012, VOL II, 2012, : 1298 - 1301
  • [10] The study of the unidirectional quay crane scheduling problem: complexity and risk-aversion
    Chen, Jiang Hang
    Bierlaire, Michel
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 260 (02) : 613 - 624