Integrated optimization of underground mine design and scheduling

被引:0
|
作者
Little, J. [1 ]
Knights, P. [1 ]
Topal, E. [2 ]
机构
[1] Univ Queensland, Sch Mech & Min Engn, Brisbane, Qld 4072, Australia
[2] Curtin Univ, WA Sch Mines, Bentley, WA, Australia
关键词
underground mine optimization; stope layouts; underground production scheduling; integer programming; mathematical programming application;
D O I
暂无
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
It is common practice for underground mine plans to be created sequentially, where results from one planning process form the input data for another. While this is practical for manual methods, computerized optimization techniques should consider an integrated approach to creating the global mine plan. This is because optimizing an individual mine planning process, such as stope layouts, introduces a likelihood of increasing costs or decreasing revenues associated with other areas, such as production scheduling, as harmful decisions must be balanced. Considering the interaction and influence that individual underground mine planning processes have on each other during optimization will provide more profitable results than if these are ignored. Optimization techniques for stope layouts and production scheduling are reviewed. An integer programming model is proposed that allows for either integrated or isolated optimization. Both approaches are separately applied to a block model. The results demonstrate the model's ability to produce optimal long-term sublevel stoping mine plans and the benefits of using an integrated approach.
引用
收藏
页码:775 / 785
页数:11
相关论文
共 50 条
  • [1] Integrated stochastic optimization of stope design and long-term underground mine production scheduling
    Furtado e Faria, Matheus
    Dimitrakopoulos, Roussos
    Lopes Pinto, Claudio Lucio
    RESOURCES POLICY, 2022, 78
  • [2] Optimization of underground mine access layout and production scheduling
    Hou, Jie
    Li, Guoqing
    Hu, Nailian
    GOSPODARKA SUROWCAMI MINERALNYMI-MINERAL RESOURCES MANAGEMENT, 2020, 36 (02): : 87 - 107
  • [3] Optimization-based heuristics for underground mine scheduling
    O'Sullivan, Donal
    Newman, Alexandra
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 241 (01) : 248 - 259
  • [4] Integrated stochastic optimisation of stope design and long-term production scheduling at an operating underground copper mine
    Andrade, Laura Carelos
    Dimitrakopoulos, Roussos
    Conway, Phil
    INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT, 2024, 38 (08) : 619 - 641
  • [5] Integrated short- and medium-term underground mine production scheduling
    Nehring, M.
    Topal, E.
    Kizil, M.
    Knights, P.
    JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2012, 112 (05) : 365 - 378
  • [6] Underground mine scheduling under uncertainty
    Nesbitt, Peter
    Blake, Lewis R.
    Lamas, Patricio
    Goycoolea, Marcos
    Pagnoncelli, Bernardo K.
    Newman, Alexandra
    Brickey, Andrea
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2021, 294 (01) : 340 - 352
  • [7] Multidisciplinary design optimization on production scale of underground metal mine
    左红艳
    罗周全
    管佳林
    王益伟
    Journal of Central South University, 2013, 20 (05) : 1332 - 1340
  • [8] A simulation–optimization framework for short-term underground mine production scheduling
    Fabián Manríquez
    Javier Pérez
    Nelson Morales
    Optimization and Engineering, 2020, 21 : 939 - 971
  • [9] Multidisciplinary design optimization on production scale of underground metal mine
    Hong-yan Zuo
    Zhou-quan Luo
    Jia-lin Guan
    Yi-wei Wang
    Journal of Central South University, 2013, 20 : 1332 - 1340
  • [10] Multidisciplinary design optimization on production scale of underground metal mine
    Zuo Hong-yan
    Luo Zhou-quan
    Guan Jia-lin
    Wang Yi-wei
    JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2013, 20 (05) : 1332 - 1340