共 23 条
- [1] ALFORD C, 1995, P 25 INT APCOM S BRI, V95, P213
- [2] Alford C., 2009, Proceedings of project evaluation conference, Melbourne, P137
- [3] Optimisation of stope limits using a heuristic approach [J]. TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2004, 113 (02): : A123 - A128
- [4] Cawrse I., 2001, 4 BIENNIAL STRATEGIC, P87
- [5] Chadwick J, 2009, INT MINING, P18
- [6] Grieco N., 2007, T I MIN METALL A, V116, pA49
- [7] Little J, 2008, P 2008 AUSTR MIN TEC, P157
- [8] Little J, 2007, THESIS U QUEENSLAND
- [9] Maptek, 2011, VULC 8 1 STOP OPT
- [10] Underground mine design and planning: Complexity and interdependencies [J]. MINERAL RESOURCES ENGINEERING, 2002, 11 (02): : 197 - 215