Stochastic single machine scheduling with an exponentially distributed due date

被引:23
作者
Jia, CF [1 ]
机构
[1] Nankai Univ, Dept Comp Sci & Syst, Tianjin 300071, Peoples R China
关键词
single machine scheduling; random processing time; common due date; Lambda-shaped schedule;
D O I
10.1016/S0167-6377(01)00065-7
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, we consider a single machine scheduling problem with random processing times to minimize the expected total weighted deviations of completion times from a random common due date. The processing times and the due date are exponentially distributed. The optimal schedules are shown to be Lambda-shaped, i.e., the sequence of w(t)lambda(t) (= w(t)/E(p(i)), p(i) is the processing time of job i) (i = 1, 2,..., n) has a single local maximum, where w(i) and lambda(i) denote the weight and the processing time rate of job i, respectively. Moreover, the case where the machine is subject to stochastic breakdowns is also discussed. (C) 2001 Elsevier Science B.V, All rights reserved.
引用
收藏
页码:199 / 203
页数:5
相关论文
共 13 条
[1]   SEQUENCING WITH EARLINESS AND TARDINESS PENALTIES - A REVIEW [J].
BAKER, KR ;
SCUDDER, GD .
OPERATIONS RESEARCH, 1990, 38 (01) :22-36
[2]  
BIRGE J, 1990, NAV RES LOG, V37, P661, DOI 10.1002/1520-6750(199010)37:5<661::AID-NAV3220370506>3.0.CO
[3]  
2-3
[4]   Stochastic scheduling on parallel machines subject to random breakdowns to minimize expected costs for earliness and tardy jobs [J].
Cai, XQ ;
Zhou, S .
OPERATIONS RESEARCH, 1999, 47 (03) :422-437
[5]   Single machine scheduling problems with general breakdowns, earliness and tardiness costs [J].
Federgruen, A ;
Mosheiov, G .
OPERATIONS RESEARCH, 1997, 45 (01) :66-71
[6]  
FORST FG, 1993, PROBAB ENG INFORM SC, V7, P291
[7]  
Frenk J. B. G., 1991, PROBAB ENG INFORM SC, V5, P297, DOI [10.1017/S0269964800002102, DOI 10.1017/S0269964800002102]
[8]   EARLINESS-TARDINESS SCHEDULING PROBLEMS .2. DEVIATION OF COMPLETION TIMES ABOUT A RESTRICTIVE COMMON DUE DATE [J].
HALL, NG ;
KUBIAK, W ;
SETHI, SP .
OPERATIONS RESEARCH, 1991, 39 (05) :847-856
[9]   EARLINESS-TARDINESS SCHEDULING PROBLEMS .1. WEIGHTED DEVIATION OF COMPLETION TIMES ABOUT A COMMON DUE DATE [J].
HALL, NG ;
POSNER, ME .
OPERATIONS RESEARCH, 1991, 39 (05) :836-846
[10]   SCHEDULING AROUND A SMALL COMMON DUE DATE [J].
HOOGEVEEN, JA ;
VANDEVELDE, SL .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1991, 55 (02) :237-242