共 50 条
- [41] Development of the northeast extreme tee (NEXT) beam for accelerated bridge construction PCI Journal, 2010, 55 (03): : 86 - 101
- [44] INTERACTION, PRACTICES AND DEVELOPMENT OF ACCELERATED BRIDGE CONSTRUCTION (ABC) IN DECK AND GIRDER Fundamental Research in Structural Engineering: Retrospective and Prospective, Vols 1 and 2, 2016, : 1576 - 1582