Risk-Based Two-Step Optimization Model for Highway Transportation Investment Decision-Making

被引:8
作者
Zhou, Bei [1 ]
Li, Zongzhi [2 ]
Patel, Harshingar [2 ]
Roshandeh, Arash M. [3 ]
Wang, Yuanqing [1 ]
机构
[1] Changan Univ, Dept Traff Engn, Xian 710064, Peoples R China
[2] IIT, Dept Civil Architectural & Environm Engn, Chicago, IL 60616 USA
[3] Purdue Univ, Sch Civil Engn, W Lafayette, IN 47906 USA
关键词
Risk; Investment; Knapsack; Decision-making; Portfolio; STOCHASTIC-DOMINANCE; ALGORITHM;
D O I
10.1061/(ASCE)TE.1943-5436.0000652
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A new methodology is introduced for project selection that explicitly addresses issues of achieving maximized overall project benefits by selecting a subcollection of candidate projects for possible implementation at a given budget level while controlling the total risk of the expected project benefits within an acceptable lower bound. The covariance value is utilized to denote the risk of the expected benefits of jointly implementing two projects, in which each project maintains a range of possible benefits and a probability distribution. The summation of all covariance values corresponding to all possible project implementation combinations represents the total risk of the expected benefits. The methodology contains two-step optimizations. First, the Markowitz mean-variance model is employed to establish the lower-bound risk of project benefits for a given budget level. Second, the conventionally accepted zero/one knapsack model for project selection is augmented to incorporate the lower-bound risk established from the first-step optimization as one additional chance constraint. In this way, the overall benefits of projects selected for implementation are maximized while controlling the total risk of the expected project benefits within a lower bound for a certain percentage of time. The proposed model is applied for a 6-year statewide interstate highway project selection and programming. Cross comparisons are made in the consistencies of project selection results generated from the basic knapsack model, proposed two-step enhanced knapsack model, and current state highway programming practice.
引用
收藏
页数:10
相关论文
共 41 条
  • [1] AASHTO, 2003, US BEN AN HIGHW
  • [2] A new Fourier transform algorithm for value-at-risk
    Albanese, C
    Jackson, K
    Wiberg, P
    [J]. QUANTITATIVE FINANCE, 2004, 4 (03) : 328 - 338
  • [3] [Anonymous], HIGHW EC REQ SYST
  • [4] [Anonymous], 1990, Knapsack Problems: Algorithms and ComputerImplementations
  • [5] [Anonymous], XPRESS SOLV ENG LP Q
  • [6] A COMPUTATIONAL STUDY OF A MULTIPLE-CHOICE KNAPSACK ALGORITHM
    ARMSTRONG, RD
    KUNG, DS
    SINHA, P
    ZOLTNERS, AA
    [J]. ACM TRANSACTIONS ON MATHEMATICAL SOFTWARE, 1983, 9 (02): : 184 - 198
  • [7] Bazaraa M. S., 1977, LINEAR PROGRAMMING N
  • [8] Bodie Z, 2021, INVESTMENTS
  • [9] RISK-BASED BRIDGE MANAGEMENT - OPTIMIZATION AND INSPECTION SCHEDULING
    CESARE, M
    SANTAMARINA, JC
    TURKSTRA, CJ
    VANMARCKE, E
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 1994, 21 (06) : 897 - 902
  • [10] A genetic algorithm for the multidimensional knapsack problem
    Chu, PC
    Beasley, JE
    [J]. JOURNAL OF HEURISTICS, 1998, 4 (01) : 63 - 86