Design to Improve the Productivity and Execution of Gravity Surveys

被引:0
|
作者
Demick, Evan [1 ]
Luukkonen, Kyle [1 ]
Nonis, Sadeep [1 ]
Zhylenko, Yuri [1 ]
机构
[1] George Mason Univ, Volgenau Sch Engn, Dept Syst Engn & Operat Res, Fairfax, VA 22030 USA
关键词
D O I
暂无
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
The National Oceanic and Atmospheric Administration (NOAA) is responsible for conducting gravity surveys which are used to measure the variations in the pull of gravity of the earth's surface. Gravity surveys are vital for the Country's safety (e. g. creation of flood plain maps and evacuation routes) and the economy (e. g. used for detecting petroleum and natural gas). The current set of gravity measurements known as the North American Vertical Datum of 1988 (NAVD 88') are outdated and lack complete coverage of the United States and its territories (e. g. Alaska has minimal data coverage). To improve accuracy, NOAA has begun a new survey, named GRAV-D, to combine existing ground (high definition) and satellite data (low definition) along with new aerial data (taken from aircraft) to establish the new datum. There is a complex logistical process in conducting the aerial surveys that are subject to large uncertainties due to weather, vehicle and personnel availability, and equipment failures. This paper describes the design of a logistics process to reduce the variation in the standard survey block from 24.59 to 15.11 days/survey. This is required to meet a Congressional mandate stipulating that the survey be completed by 2022. Analysis of factors affecting the completion of block surveys indicates high variability in aircraft maintenance, equipment repair, and weather related delays. Analysis using a decision-support tool designed to assist planners in managing the process by identifying elements that contribute to schedule risk, and advising mitigating strategies, indicates improved contingency planning through: (i) additional spares, (ii) additional support personnel, (iii) weather forecasting, and (iv) improved coordination among contractors would significantly reduce delays in the execution of the plans.
引用
收藏
页码:179 / 183
页数:5
相关论文
共 50 条
  • [1] FORKLIFT APPLICATION SURVEYS IMPROVE PRODUCTIVITY
    KELLY, M
    INDUSTRIAL ENGINEERING, 1993, 25 (06): : 16 - 16
  • [3] USING OFFICE DESIGN TO IMPROVE PRODUCTIVITY
    不详
    OFFICE ADMINISTRATION AND AUTOMATION, 1985, 46 (02): : 26 - &
  • [4] Improve Quality & Productivity With Advanced Screw Design
    Bozzelli, John
    Plastics Technology, 2021, 67 (01) : 14 - 16
  • [5] Using Structured ASIC to Improve Design Productivity
    Tsai, Yu-Wen
    Wu, Kun-Chen
    Tung, Hui-Hsiang
    Lin, Rung-Bin
    PROCEEDINGS OF THE 2009 12TH INTERNATIONAL SYMPOSIUM ON INTEGRATED CIRCUITS (ISIC 2009), 2009, : 137 - +
  • [6] DESIGN, PLAN, AND EXECUTION OF GRAVEL-PACK OPERATIONS FOR MAXIMUM PRODUCTIVITY
    GURLEY, DG
    COPELAND, CT
    HENDRICK, JO
    JOURNAL OF PETROLEUM TECHNOLOGY, 1977, 29 (OCT): : 1259 - 1266
  • [7] Comparing gravity and gravity gradient surveys
    Barnes, Gary J.
    Lumley, John M.
    Houghton, Phill I.
    Gleave, Richard J.
    GEOPHYSICAL PROSPECTING, 2011, 59 (01) : 176 - 187
  • [8] GRAVITY SURVEYS IN SUBMARINES
    MEINESZ, FAV
    ENDEAVOUR, 1948, 7 (28) : 170 - 173
  • [9] GRAVITY SURVEYS IN UTAH
    COOK, KL
    TRANSACTIONS-AMERICAN GEOPHYSICAL UNION, 1969, 50 (10): : 538 - &
  • [10] MARINE GRAVITY SURVEYS
    PARKER, PW
    CROCKER, J
    GEOPHYSICAL JOURNAL OF THE ROYAL ASTRONOMICAL SOCIETY, 1986, 85 (01): : 252 - 252