Knowledge Contribution as a Factor in Project Selection

被引:6
作者
Geng, Shuang [1 ]
Chuah, Kong Bieng [2 ]
Law, Kris M. Y. [3 ]
Cheung, Che Keung [2 ]
Chau, Y. C. [2 ]
Rui, Cao [4 ]
机构
[1] Shenzhen Univ, Management Sci Dept, Management Sch, Shenzhen, Peoples R China
[2] City Univ Hong Kong, Syst Engn & Engn Management Dept, Coll Sci & Engn, Hong Kong, Hong Kong, Peoples R China
[3] Hong Kong Polytech Univ, Dept Ind & Syst Engn, Fac Engn, Hong Kong, Hong Kong, Peoples R China
[4] Crest View Technol Investment Ltd, Shenzhen, Peoples R China
关键词
project selection; multicriteria decision making; project-based learning; DECISION-SUPPORT; MANAGEMENT; METHODOLOGY; GOVERNANCE;
D O I
10.1177/875697281804900103
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Project selection is a crucial decision-making process in many organizations. By adopting a project-based learning perspective, this study sets out to develop a framework to integrate organizational knowledge development with project selection. We utilize various knowledge management models to create a structured evaluation metric to measure project contribution to organizational knowledge. A project selection model, which involves project knowledge contribution as one of the evaluation perspectives, is proposed. Results of a focus group study effectively validate the proposed evaluation metric. The article concludes with an empirical implementation of the model in an electronic component manufacturing company.
引用
收藏
页码:25 / 41
页数:17
相关论文
共 50 条
[21]   Knowledge extract process in knowledge management project [J].
Matos, Guillermo ;
Chalmeta, Ricardo .
PROCEEDINGS OF THE 7TH WSEAS INTERNATIONAL CONFERENCE ON APPLIED INFORMATICS AND COMMUNICATIONS, 2007, :295-299
[22]   A FUZZY DECISION SUPPORT SYSTEM FOR SUSTAINABLE CONSTRUCTION PROJECT SELECTION: AN INTEGRATED FPP-FIS MODEL [J].
Fallahpour, Alireza ;
Wong, Kuan Yew ;
Rajoo, Srithar ;
Olugu, Ezutah Udoncy ;
Nilashi, Mehrbakhsh ;
Turskis, Zenonas .
JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2020, 26 (03) :247-258
[23]   PROJECT SELECTION REVISITED: CUSTOMIZED TYPE-2 FUZZY ORESTE APPROACH FOR PROJECT PRIORITIZATION [J].
Uluskan, Meryem ;
Beki, Busra .
INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2024, 31 (02) :317-339
[24]   KNOWLEDGE- SHARING WITHIN THE PROJECT-BASED ORGANIZSATION: A KNOWLEDGE-PULL FRAMEWORK [J].
Bell, L. ;
van Waveren, C. C. ;
Steyn, H. .
SOUTH AFRICAN JOURNAL OF INDUSTRIAL ENGINEERING, 2016, 27 (04) :18-33
[25]   How Knowledge Validation Processes Affect Knowledge Contribution [J].
Durcikova, Alexandra ;
Gray, Peter .
JOURNAL OF MANAGEMENT INFORMATION SYSTEMS, 2009, 25 (04) :81-107
[26]   Project Portfolio Selection considering interdependencies: A review of terminology and approaches [J].
Vieira, Gustavo Barbi ;
Oliveira, Hevilla Souza ;
Almeida, Jonatas Araujo de ;
Belderrain, Mischel Carmen Neyra .
PROJECT LEADERSHIP AND SOCIETY, 2024, 5
[27]   Profit-fairness trade-off in project selection [J].
Naldi, Maurizio ;
Nicosia, Gaia ;
Pacifici, Andrea ;
Pferschy, Ulrich .
SOCIO-ECONOMIC PLANNING SCIENCES, 2019, 67 :133-146
[28]   Project selection - A process analysis [J].
Daniel, HZ ;
Hempel, DJ ;
Srinivasan, N .
INDUSTRIAL MARKETING MANAGEMENT, 2003, 32 (01) :39-54
[29]   The Application of Fuzzy Analytic Hierarchy Process in Sustainable Project Selection [J].
Alyamani, Rakan ;
Long, Suzanna .
SUSTAINABILITY, 2020, 12 (20) :1-16
[30]   Project selection: Commitment and competition [J].
Atal, Vidya ;
Bar, Talia ;
Gordon, Sidartha .
GAMES AND ECONOMIC BEHAVIOR, 2016, 96 :30-48