Proposal of evaluation indices for human-made rivalrous resource allocation in steel manufacturing

被引:2
作者
Nishino, Nariaki [1 ]
Ogata, Taiki [2 ]
Nishida, Kentaro [3 ]
Yaji, Yasuhito [4 ]
机构
[1] Univ Tokyo, Sch Engn, Dept Technol Management Innovat, Tokyo 1138654, Japan
[2] Univ Tokyo, Ctr Engn RACE, Tokyo 1138654, Japan
[3] Tokyo Inst Technol, Grad Sch Innovat Management, Tokyo, Japan
[4] Nippon Steel & Sumitomo Met Corp, Tokyo, Japan
关键词
Scheduling; Coordination; Human aspect;
D O I
10.1016/j.cirp.2013.03.140
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
During steel production, pig iron generally streams from a huge blast furnace into respective downstream factories where various types of steel are produced as finished products. Although a production schedule is planned from a holoscopic viewpoint, in practice, human-made rescheduling is eventually conducted immediately before manufacturing to adapt to dynamic environmental changes. Rivalous engineers in this environment deliberate and then allocate resources to each factory. This study proposes six indices to evaluate such human-decided allocation. Then, computer simulations of several scenarios are used to elucidate the indices' salient characteristics and to assess their effectiveness. (C) 2013 CIRP.
引用
收藏
页码:439 / 442
页数:4
相关论文
共 7 条
[1]   Steel production schedule generation [J].
Assaf, I ;
Chen, M ;
Katzberg, J .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (02) :467-477
[2]   A multi-agent architecture for dynamic scheduling of steel hot rolling [J].
Cowling, PI ;
Ouelhadj, D ;
Petrovic, S .
JOURNAL OF INTELLIGENT MANUFACTURING, 2003, 14 (05) :457-470
[3]  
Debab K, 2003, MAT MANUFACTURING PR, V18, P409
[4]   A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron & Steel Complex [J].
Tang, LX ;
Liu, JY ;
Rong, AY ;
Yang, ZH .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2000, 124 (02) :267-282
[5]   An emergent synthesis approach to simultaneous process planning and scheduling [J].
Ueda, K. ;
Fujii, N. ;
Inoue, R. .
CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2007, 56 (01) :463-466
[6]   Aggregation -: The key to integrating production planning and scheduling [J].
Váncza, J ;
Kis, T ;
Kovács, A .
CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2004, 53 (01) :377-380
[7]  
VOORHIS TV, 2001, COMPUT IND ENG, V39, P219, DOI DOI 10.1016/S0360-8352(01)00003-1