Capacity design and operation planning of a hybrid PV-wind-battery-diesel power generation system in the case of Deokjeok Island

被引:41
作者
Shin, Younggy [1 ]
Koo, Wong Yong [2 ]
Kim, Tae Hyung [3 ]
Jung, Seunghyun [3 ]
Kim, Hyeonsoo [3 ]
机构
[1] Sejong Univ, Dept Mech Engn, Seoul 143747, South Korea
[2] E Mining Co, Goyang Si 411805, Gyeonggi Do, South Korea
[3] Korea Inst Civil Engn & Bldg Technol, Goyang Si 411712, Gyeonggi Do, South Korea
关键词
Hybrid power system; Capacity optimization; Linear programming; EnergyPlus; Diesel generator; Renewable energy; ENERGY-STORAGE SYSTEMS;
D O I
10.1016/j.applthermaleng.2015.06.043
中图分类号
O414.1 [热力学];
学科分类号
摘要
The study was conducted for optimal design of hybrid power generation system (HPS) in which diesel generators and renewable energy generators are incorporated to supply electricity to islands isolated from the national grid. In order to optimally design capacity and operation planning of the hybrid system, hourly electricity demand data is needed over 8760 h of a year. The required hourly data was simulated from monthly electricity consumption reports and EnergyPlus-based building models. An optimization method that matches hourly supply and demand may encounter problems of exhaustive computing time and 'out of memory' because size of associated matrices increases in multiples of 8760 x 8760. The problems were resolved with sparse matrices and the linear programming algorithm. Linear constraints necessary for the linear programming were developed in this study. According to the simulation result with the target island (Deokjeok Island), the optimization method recommends a hybrid generation system rather than a conventional diesel only system due to high fuel cost. And the capacity design reflects renewable energy resources abundant in the island. And designed operation planning illustrates good hourly matching of demand and supply over 8760 h with minimal excess electricity, which validates integrity of the proposed design method. (C) 2015 Elsevier Ltd. All rights reserved.
引用
收藏
页码:514 / 525
页数:12
相关论文
共 17 条
[1]  
Anayochukwu A. V., 2014, INFORM SCI REF, P417
[2]  
Anhui Hummer Dynamo Co, 2014, HUMM H19 2 100KW
[3]  
[Anonymous], 2013, LAZ LEV COST EN AN V
[4]  
[Anonymous], 2011, NRELTP550046861 US D
[5]  
[Anonymous], 2014, EZYSYNC ES3600 BIDIR
[6]   Operation Strategy and Parametric Analysis of a CHP and a Tri-Generation System for Integrated Community [J].
Choi, Junwon ;
Yun, Rin .
INTERNATIONAL JOURNAL OF AIR-CONDITIONING AND REFRIGERATION, 2015, 23 (01)
[7]   Sustainable energy systems for a remote island community [J].
Chua, K. J. ;
Yang, W. M. ;
Er, S. S. ;
Ho, C. A. .
APPLIED ENERGY, 2014, 113 :1752-1763
[8]   Multi-objective optimization minimizing cost and life cycle emissions of stand-alone PV-wind-diesel systems with batteries storage [J].
Dufo-Lopez, Rodolfo ;
Bernal-Agustin, Jose L. ;
Yusta-Loyo, Jose M. ;
Dominguez-Navarro, Jose A. ;
Ramirez-Rosado, Ignacio J. ;
Lujano, Juan ;
Aso, Ismael .
APPLIED ENERGY, 2011, 88 (11) :4033-4041
[9]  
EnergyPlus Energy Simulation Software, 2014, ENERGYPLUS EN SIM SO
[10]   Multi-objective optimized management of electrical energy storage systems in an islanded network with renewable energy sources under different design scenarios [J].
Ippolito, M. G. ;
Di Silvestre, M. L. ;
Sanseverino, E. Riva ;
Zizzo, G. ;
Graditi, G. .
ENERGY, 2014, 64 :648-662