Installation and Commissioning of the CMS Level-1 Calorimeter Trigger Upgrade

被引:0
|
作者
Klabbers, P. [1 ]
Aggleton, R. [2 ]
Baber, M.
Barbieri, R.
Belknap, A. [1 ]
Berryhill, J. [5 ]
Brooke, J. [2 ]
Bundock, A. [3 ]
Cali, I. [4 ]
Hermida, M. Cepeda [1 ]
Dasgupta, S. [2 ]
da Silva, J. C. [6 ]
Dasu, S. [1 ]
Durkin, T. [7 ]
Fobes, R. [1 ]
Ghabrous, C. [8 ]
Gorski, T. [1 ]
Grimes, M. [2 ]
Guilbaud, M. [9 ]
Guo, Z. [1 ]
Hall, G. [3 ]
Harder, K. [7 ]
Harper, S. [7 ]
Iles, G. [3 ]
Innocenti, G. M. [4 ]
Ives, S. [3 ]
Jones, J. [10 ]
Kreis, B. [5 ]
Lee, Y. [4 ]
Li, W. [9 ]
Lucas, C. [2 ]
Lucas, R. [3 ]
Marrouche, J. [3 ]
Newbold, D. [2 ,7 ]
Northup, M. [9 ]
Oljavo, I. [1 ]
Paramesvaran, S. [2 ]
Rivera, R. [5 ]
Roland, C. [4 ]
Rose, A. [3 ]
Sankey, D. [7 ]
Smith, W. H. [1 ]
Svetek, A. [1 ]
Tapper, A. [3 ]
Thea, A. [7 ]
Tikalsky, J. [1 ]
Uplegger, L. [5 ]
Vicente, M. [1 ]
Williams, T. [2 ]
Wyslouch, B. [4 ]
机构
[1] Univ Wisconsin, Madison, WI 53706 USA
[2] Univ Bristol, Bristol, Avon, England
[3] Imperial Coll, London, England
[4] MIT, Cambridge, MA 02139 USA
[5] FNAL, Batavia, IL USA
[6] LIP, Lisbon, Portugal
[7] Rutherford Appleton Lab, Didcot, Oxon, England
[8] CERN, Geneva, Switzerland
[9] Rice Univ, Houston, TX USA
[10] Iceberg Technol, Shakopee, MN USA
关键词
D O I
暂无
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
The Compact Muon Solenoid (CMS) experiment is currently installing upgrades to their Calorimeter Trigger for LHC Run 2 to ensure that the trigger thresholds can stay low, and physics data collection will not be compromised. The electronics will be upgraded in two stages. Stage-1 for 2015 will upgrade some electronics and links from copper to optical in the existing calorimeter trigger so that the algorithms can be improved and we do not lose valuable data before stage-2 can be fully installed by 2016. Stage-2 will fully replace the calorimeter trigger at CMS with a micro-TCA and optical link system. It requires that the updates to the calorimeter back-ends, the source of the trigger primitives, be completed. The new system's boards will utilize Xilinx Virtex-7 FPGAs and have hundreds of highspeed links operating at up to 10 Gbps to maximize data throughput. The integration, commissioning, and installation of stage-1 in 2015 will be described, as well as the integration and parallel installation of the stage-2 in 2015, for a fully upgraded CMS calorimeter trigger in operation by 2016.
引用
收藏
页数:4
相关论文
共 50 条
  • [31] Design of online control and monitoring software for the CPPF system in the CMS Level-1 trigger upgrade
    Li-Bo Cheng
    Peng-Cheng Cao
    Jing-Zhou Zhao
    Zhen-An Liu
    NuclearScienceandTechniques, 2018, 29 (11) : 84 - 91
  • [32] A 40 MHz Level-1 trigger scouting system for the CMS Phase-2 upgrade
    Ardino, Rocco
    Deldicque, Christian
    Dobson, Marc
    Giorgetti, Sabrina
    Grosso, Gaia
    James, Thomas
    Meschi, Emilio
    Rabady, Dinyar
    Racz, Attila
    Sakulin, Hannes
    Zejdl, Petr
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2023, 1047
  • [33] Design of online control and monitoring software for the CPPF system in the CMS Level-1 trigger upgrade
    Li-Bo Cheng
    Peng-Cheng Cao
    Jing-Zhou Zhao
    Zhen-An Liu
    Nuclear Science and Techniques, 2018, 29
  • [34] Commissioning of the ATLAS Level-1 central trigger system
    Sherman, Daniel
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2010, 623 (01): : 552 - 554
  • [35] First data with the ATLAS Level-1 Calorimeter Trigger
    Achenbach, R.
    Adragna, P.
    Aharrouche, M.
    Andrei, V.
    Asman, B.
    Barnett, B. M.
    Bauss, B.
    Bendel, M.
    Bohm, C.
    Booth, J. R. A.
    Bracinik, J.
    Brawn, I. P.
    Charlton, D. G.
    Childers, J. T.
    Collins, N. J.
    Curtis, C. J.
    Davis, A. O.
    Eckweiler, S.
    Eisenhandler, E.
    Faulkner, P. J. W.
    Fleckner, J.
    Foehlisch, F.
    Gee, C. N. P.
    Gillman, A. R.
    Goeringer, C.
    Groll, M.
    Hadley, D. R.
    Hanke, P.
    Hellman, S.
    Hidvegi, A.
    Hillier, S. J.
    Johansen, M.
    Kluge, E. -E.
    Kuhl, T.
    Landon, M.
    Lendermann, V.
    Lilley, J. N.
    Mahboubi, K.
    Mahout, G.
    Meier, K.
    Middleton, R. P.
    Moa, T.
    Morris, J. D.
    Mueller, F.
    Neusiedl, A.
    Ohm, C.
    Oltmann, B.
    Perera, V. J. O.
    Prieur, D. P. F.
    Qian, W.
    2008 IEEE NUCLEAR SCIENCE SYMPOSIUM AND MEDICAL IMAGING CONFERENCE (2008 NSS/MIC), VOLS 1-9, 2009, : 1126 - +
  • [36] The CMS Level-1 trigger for LHC Run II
    Tapper, A.
    JOURNAL OF INSTRUMENTATION, 2018, 13
  • [37] Commissioning of the ATLAS Level-1 Trigger with Cosmic Rays
    Pauly, Thilo
    2007 EUROPHYSICS CONFERENCE ON HIGH ENERGY PHYSICS, PTS 1-12, 2008, 110
  • [38] RPC system in the CMS Level-1 Muon Trigger
    Samalan, A.
    Tytgat, M.
    Zaganidis, N.
    Alves, G. A.
    Marujo, F.
    Da Silva De Araujo, F. Torres
    Da Costa, E. M.
    De Jesus Damiao, D.
    Nogima, H.
    Santoro, A.
    Fonseca De Souza, S.
    Aleksandrov, A.
    Hadjiiska, R.
    Iaydjiev, P.
    Rodozov, M.
    Shopova, M.
    Sultanov, G.
    Bonchev, M.
    Dimitrov, A.
    Litov, L.
    Pavlov, B.
    Petkov, P.
    Petrov, A.
    Qian, S. J.
    Cao, P.
    Kou, H.
    Liu, Z.
    Song, J.
    Zhao, J.
    Bernal, C.
    Cabrera, A.
    Fraga, J.
    Sarkar, A.
    Elsayed, S.
    Assran, Y.
    El Sawy, M.
    Mahmoud, M. A.
    Mohammed, Y.
    Combaret, C.
    Gouzevitch, M.
    Grenier, G.
    Laktineh, I
    Mirabito, L.
    Shchablo, K.
    Bagaturia, I
    Lomidze, D.
    Lomidze, I
    Bhatnagar, V
    Gupta, R.
    Kumari, P.
    JOURNAL OF INSTRUMENTATION, 2020, 15 (10):
  • [39] 40 MHz Scouting for the CMS Level-1 Trigger
    Giorgetti, S.
    NUOVO CIMENTO C-COLLOQUIA AND COMMUNICATIONS IN PHYSICS, 2024, 47 (03):
  • [40] The New Dempty set Level-1 Calorimeter Trigger
    Abolins, M.
    Adams, M.
    Adams, T.
    Agulio, E.
    Bagby, L.
    Ban, J.
    Barberis, E.
    Beale, S.
    Benitez, J.
    Biel, J.
    Brock, R.
    Bystricky, J.
    Calvet, D.
    Cihangir, S.
    Cwiok, M.
    Edmunds, D.
    Evans, H.
    Fantasia, C.
    Foglesong, J.
    Green, J.
    Hegeman, J.
    Kehoe, R.
    Laurens, P.
    Le Du, P.
    Johnson, C.
    Lammers, S.
    Mitrevski, J.
    Mulhearn, M.
    Naimuddin, M.
    Padley, B. P.
    Parsons, J.
    Pawloski, G.
    Perez, E.
    Renkel, P.
    Roe, A.
    Sippach, W.
    Stone, A.
    Tarte, G.
    Taylor, W.
    Unalan, R.
    Varelas, N.
    Weerts, H.
    Wood, D.
    Zhang, L.
    Zmuda, T.
    2006 IEEE NUCLEAR SCIENCE SYMPOSIUM CONFERENCE RECORD, VOL 1-6, 2006, : 1392 - 1395