Congruence Between Capital Project Decision Model and Performance Evaluation Model

被引:0
|
作者
Al-Zwaylif, Inaam [1 ]
机构
[1] Al Zaytoonah Univ Jordan, Amman, Jordan
关键词
capital project decisions; discounted cash flow; goal congruence; investment centers; performance evaluation; INTERTEMPORAL COST ALLOCATION;
D O I
暂无
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Capital investment decisions are the most critical decisions facing business organizations because these decisions have a long-range effect on the organizations. Goal conflict can arise when the discounted cash flow (DCF) model is used to evaluate and select capital-budgeting projects and the accrual accounting model is used for evaluating the performance of investment centers. To avoid dysfunctional decision making and reach goal congruence, the consistency between DCF decision model and performance evaluation model should achieve. The aim of this study is to propose an approach for achieving congruence between the DCF decision model and performance evaluation model. It also aims to present and discuss the techniques for achieving congruence between the two models in a historical context by reviewing relevant literature, as well as to demonstrate the importance of such congruence to rationalize the capital budgeting decisions. To resolve goal-congruence problem and rationalized investment decisions, this paper proposed using the balanced scorecard approach to evaluate the performance of investment centers. Accordingly, a balanced scorecard should be prepared for the organization as a whole and for each investment center. The proposed approach will help organizations to achieve goal congruence by motivating the managers to act in the best interests of the business as a whole and take the correct decision.
引用
收藏
页码:35 / 40
页数:6
相关论文
共 50 条
  • [1] Study on venture capital project withdrawal decision model
    Xia, EJ
    Ren, PM
    Shao, WW
    PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, VOLS 1 AND 2, 2004, : 2462 - 2467
  • [2] A Model of Project Evaluation Based on Group Decision Making
    Fan, Fu-rong
    Zhao, Xi-nan
    Wang, Qi-ming
    2008 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-11, 2008, : 2005 - 2008
  • [3] DECISION TREE METHODOLOGY IN CAPITAL PROJECT EVALUATION
    CANADA, JR
    JOURNAL OF INDUSTRIAL ENGINEERING, 1967, 18 (12): : 719 - &
  • [4] Impact of Communication on Capital Project Performance: A Mediated Moderation Model
    Chen, Hong-Long
    SUSTAINABILITY, 2021, 13 (20)
  • [5] IT security auditing: A performance evaluation decision model
    Herath, Hemantha S. B.
    Herath, Tejaswini C.
    DECISION SUPPORT SYSTEMS, 2014, 57 : 54 - 63
  • [6] A dynamic multiple objects decision model of venture capital project based on option
    Shen, H
    Lu, GZ
    Wu, WY
    PROCEEDINGS OF 2002 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, VOLS I AND II, 2002, : 1639 - 1642
  • [7] Application of Comprehensive Risk Evaluation Model in Project Invest Decision
    Xin Chun Hua
    Zhang Xing Chen
    CALL OF PAPER PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING, 2008, : 1186 - 1190
  • [8] A Performance Evaluation Model for E-government Project
    Yang, Yang
    Hu, Kejin
    2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 9158 - +
  • [9] Project Capital Allocation Combination Equilibrium Decision Model Based on Behavioral Option Game
    Zhong, Meirui
    Zeng, Anqi
    Huang, Jianbai
    Hong, Kairong
    DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2014, 2014
  • [10] Venture capital project selection based on interval number grey target decision model
    Fu, Sha
    Xiao, Ye-zhi
    Zhou, Hang-jun
    Liu, Sheng-zong
    SOFT COMPUTING, 2021, 25 (06) : 4865 - 4874