Sectionalising methodology for parallel system restoration based on graph theory

被引:42
作者
Quiros-Tortos, Jairo [1 ]
Panteli, Mathaios [1 ]
Wall, Peter [1 ]
Terzija, Vladimir [1 ]
机构
[1] Univ Manchester, Sch Elect & Elect Engn, Manchester M13 9PL, Lancs, England
基金
英国工程与自然科学研究理事会;
关键词
Compendex;
D O I
10.1049/iet-gtd.2014.0727
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Parallel power system restoration (PPSR) restores isolated sections (islands) of the network in parallel, thus the overall restoration process is accelerated. These islands are defined during the preparation stage of PPSR as part of a sectionalising strategy (SS). During this process, it is important that the operators only use updated post-blackout system information. This study proposes a new methodology based on the 'cut-set' matrix defined in graph theory, which can identify a shortlist of suitable SSs that satisfy the critical PPSR constraints in a few minutes. This short list of SSs, not identified in previous works, can be presented to the operators to help them select a restoration plan that is tailored to the specific changes in topology and asset availability that the blackout has caused. The methodology is illustrated using the IEEE 9-bus system, and validated using the IEEE 118-bus and the Polish 3375-bus system to demonstrate the efficiency of the new approach for large-scale networks. Multiple case studies are developed to demonstrate the adaptability of the methodology to different system conditions, for example, the unavailability of assets. In every case, the methodology quickly identified a number of SSs that create suitable islands for parallel restoration.
引用
收藏
页码:1216 / 1225
页数:10
相关论文
共 20 条
  • [1] Adibi M. M., 1991, IEEE Computer Applications in Power, V4, P19, DOI 10.1109/67.75871
  • [2] Remote cranking of steam electric stations
    Adibi, MM
    Milanicz, DP
    Volkmann, TL
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 1996, 11 (03) : 1613 - 1618
  • [3] OVERVOLTAGE CONTROL DURING RESTORATION
    ADIBI, MM
    ALEXANDER, RW
    AVRAMOVIC, B
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 1992, 7 (04) : 1464 - 1470
  • [4] SPECIAL CONSIDERATIONS IN POWER-SYSTEM RESTORATION
    ADIBI, MM
    FINK, LH
    ANDREWS, CJ
    ARSANJANI, F
    LANIER, MW
    MILLER, JM
    VOLKMANN, TA
    WRUBEL, J
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 1992, 7 (04) : 1419 - 1427
  • [5] POWER-SYSTEM RESTORATION PLANNING
    ADIBI, MM
    FINK, LH
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 1994, 9 (01) : 22 - 28
  • [6] Estimating restoration duration
    Adibi, MM
    Milanicz, DP
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 1999, 14 (04) : 1493 - 1498
  • [7] Adibi MM, 1999, IEEE T POWER SYST, V14, P1085, DOI 10.1109/59.780930
  • [8] Afrakhte H, 2009, IRAN J SCI TECHNOL B, V33, P463
  • [9] [Anonymous], 1987, IEEE T POWER SYST, V2, P271
  • [10] Chen W.K., 1997, Graph Theory and its Engineering Applications