Uncertainty Evaluation in Measure Results of Rock Permeability

被引:1
作者
Chen Yan [1 ]
机构
[1] PetroChina, Daqing Oilfield Co Ltd, Explorat & Dev Res Inst, Daqing 163712, Peoples R China
来源
MEASUREMENT AND CONTROL OF GRANULAR MATERIALS | 2012年 / 508卷
关键词
Reservoir; Permeability; Uncertainty; Evaluation; Measure Results;
D O I
10.4028/www.scientific.net/AMR.508.47
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper introduced the measure methods model and principles of Permeability in the ECK- II; the uncertainty source for the measure results was analyzed in detail. Combined with the test and calibration works; the mathematical model was established; considering each uncertainty component which affected the measure results of rock permeability. The standard samples of cores; A38(length:2.495cm;diameter:2.456cm);was taken for example. The uncertainty of measure results was carried out by type A and B estimation; the relative uncertainty of the method was calculated. Through reasonable evaluated the components of uncertainty which including causing uncertainty by pressure changing; temperature changing; stability of the measure instruments and vernier caliper reading error. The uncertainty from stability of the measure instruments was detailedly analyzed by the line graph. By evaluating uncertainty of rock permeability in measure results; we find that the biggest influence on total standard uncertainty is the core size; so in the work the operator's experimental skills should be paid great attention to.
引用
收藏
页码:47 / 50
页数:4
相关论文
共 3 条
[1]  
Han Zexi, 2011, ELECT TEST, V6, P38
[2]  
Huang Futang, 1999, DEV AUTOMATIC MEASUR, pl2
[3]  
The National Temperature Measurement Technology Committee, 2004, VER REG LIQ IN GLASS