Itinerary planning with time budget for risk-averse travelers

被引:11
作者
Zhang, Yu [1 ]
Tang, Jiafu [2 ]
机构
[1] Northeastern Univ, State Key Lab Synthet Automat Proc Ind, Dept Syst Engn, Shenyang 110004, Liaoning, Peoples R China
[2] Dongbei Univ Finance & Econ, Coll Management Sci & Engn, Dalian 116000, Peoples R China
基金
中国国家自然科学基金;
关键词
Uncertainty modeling; Itinerary planning with time budget; Utility theory; Decomposition; Network modification; TRANSIT-NETWORK DESIGN; SHORTEST-PATH PROBLEM; PUBLIC TRANSPORTATION; TRAFFIC EQUILIBRIUM; TAKING BEHAVIOR; ROUTE CHOICE; MODEL; ASSIGNMENT; OPTIMIZATION; METHODOLOGY;
D O I
10.1016/j.ejor.2017.11.023
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Itinerary planning problem (IPP) in public transport networks has witnessed to be a fundamental and important problem in public transport operations management. Although empirical studies show that time budgets are usually prescribed by travelers, the time budget is rarely considered in literature related to IPP under stochastic travel times. In this paper, we study the IPP with time budget (IPPB) in public transport networks with stochastic travel times, which consists of planning an itinerary from an origin to a destination that helps risk-averse travelers mitigate uncertainty and effectively meet their time budgets. A mathematical model (MRHA-IPPB) is developed for the IPPB, in which we use the utility theory to characterize travelers' risk-averse behaviors. Since minimizing the lateness probability or the expected lateness duration is intractable, we propose a new decision criterion, maximizing risk-hedging ability (short for MRHA hereafter) while guaranteeing that the corresponding certainty equivalent of itinerary travel time would not exceed the time budget. The model MRHA-IPPB is shown theoretically and numerically to consider both the lateness probability and the lateness duration. We show NP-completeness of the IPPB with fully correlated arc travel times and study two tractable scenarios, i.e., the IPPB with independent arc travel times and that with partially correlated arc travel times. We decompose an IPPB as a two-stage problem and efficiently solve it through a binary search scheme with a label-setting algorithm embedded. We demonstrate the effectiveness of the MRHA-IPPB model through an illustrative example and show that the MRHA-based decomposition approach requires only less than one second per query over a real-world public transport network. (C) 2017 Elsevier B.V. All rights reserved.
引用
收藏
页码:288 / 303
页数:16
相关论文
共 50 条
  • [31] Risk-averse formulations and methods for a virtual power plant
    Lima, Ricardo M.
    Conejo, Antonio J.
    Langodan, Sabique
    Hoteit, Ibrahim
    Knio, Omar M.
    COMPUTERS & OPERATIONS RESEARCH, 2018, 96 : 349 - 372
  • [32] Risk-averse stochastic path detection
    Collado, Ricardo
    Meisel, Stephan
    Priekule, Laura
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 260 (01) : 195 - 211
  • [33] Risk-averse model predictive control
    Sopasakis, Pantelis
    Herceg, Domagoj
    Bemporad, Alberto
    Patrinos, Panagiotis
    AUTOMATICA, 2019, 100 : 281 - 288
  • [34] Robust and resilience budget allocation for projects with a risk-averse approach: A case study in healthcare projects
    Lotfi, Reza
    Haqiqat, Ehsan
    Rajabi, Mohammad Sadra
    Hematyar, Amirhosein
    COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 176
  • [35] Stackelberg Game of Buyback Policy in Supply Chain with a Risk-Averse Retailer and a Risk-Averse Supplier Based on CVaR
    Zhou, Yanju
    Chen, Qian
    Chen, Xiaohong
    Wang, Zongrun
    PLOS ONE, 2014, 9 (09):
  • [36] Risk-averse receding horizon motion planning for obstacle avoidance using coherent risk measures
    Dixit, Anushri
    Ahmadi, Mohamadreza
    Burdick, Joel W.
    ARTIFICIAL INTELLIGENCE, 2023, 325
  • [37] A sustainable risk-averse approach to power generation planning with disruption risk and social responsibility considerations
    Seddighi, Amir Hossein
    Ahmadi-Javid, Amir
    JOURNAL OF CLEANER PRODUCTION, 2015, 105 : 116 - 133
  • [38] Risk-Averse Stochastic Programming for Planning Hybrid Electrical Energy Systems: A Brazilian Case
    Kitamura, Daniel
    Willer, Leonardo
    Dias, Bruno
    Soares, Tiago
    ENERGIES, 2023, 16 (03)
  • [39] The value of rolling-horizon policies for risk-averse hydro-thermal planning
    Cuigues, Vincent
    Sagastizabal, Claudia
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2012, 217 (01) : 129 - 140
  • [40] Risk-averse multi-objective optimal combined heat and power planning considering voltage security constraints
    Yadegari, Saeed
    Abdi, Hamdi
    Nikkhah, Saman
    ENERGY, 2020, 212