Itinerary planning with time budget for risk-averse travelers

被引:11
作者
Zhang, Yu [1 ]
Tang, Jiafu [2 ]
机构
[1] Northeastern Univ, State Key Lab Synthet Automat Proc Ind, Dept Syst Engn, Shenyang 110004, Liaoning, Peoples R China
[2] Dongbei Univ Finance & Econ, Coll Management Sci & Engn, Dalian 116000, Peoples R China
基金
中国国家自然科学基金;
关键词
Uncertainty modeling; Itinerary planning with time budget; Utility theory; Decomposition; Network modification; TRANSIT-NETWORK DESIGN; SHORTEST-PATH PROBLEM; PUBLIC TRANSPORTATION; TRAFFIC EQUILIBRIUM; TAKING BEHAVIOR; ROUTE CHOICE; MODEL; ASSIGNMENT; OPTIMIZATION; METHODOLOGY;
D O I
10.1016/j.ejor.2017.11.023
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Itinerary planning problem (IPP) in public transport networks has witnessed to be a fundamental and important problem in public transport operations management. Although empirical studies show that time budgets are usually prescribed by travelers, the time budget is rarely considered in literature related to IPP under stochastic travel times. In this paper, we study the IPP with time budget (IPPB) in public transport networks with stochastic travel times, which consists of planning an itinerary from an origin to a destination that helps risk-averse travelers mitigate uncertainty and effectively meet their time budgets. A mathematical model (MRHA-IPPB) is developed for the IPPB, in which we use the utility theory to characterize travelers' risk-averse behaviors. Since minimizing the lateness probability or the expected lateness duration is intractable, we propose a new decision criterion, maximizing risk-hedging ability (short for MRHA hereafter) while guaranteeing that the corresponding certainty equivalent of itinerary travel time would not exceed the time budget. The model MRHA-IPPB is shown theoretically and numerically to consider both the lateness probability and the lateness duration. We show NP-completeness of the IPPB with fully correlated arc travel times and study two tractable scenarios, i.e., the IPPB with independent arc travel times and that with partially correlated arc travel times. We decompose an IPPB as a two-stage problem and efficiently solve it through a binary search scheme with a label-setting algorithm embedded. We demonstrate the effectiveness of the MRHA-IPPB model through an illustrative example and show that the MRHA-based decomposition approach requires only less than one second per query over a real-world public transport network. (C) 2017 Elsevier B.V. All rights reserved.
引用
收藏
页码:288 / 303
页数:16
相关论文
共 50 条
  • [21] Construction of Risk-Averse Enhanced Index Funds
    Lejeune, Miguel A.
    Samatli-Pac, Gulay
    INFORMS JOURNAL ON COMPUTING, 2013, 25 (04) : 701 - 719
  • [22] Design and Planning of Closed-Loop Supply Chains: A Risk-Averse Multistage Stochastic Approach
    Zeballos, Luis J.
    Mendez, Carlos A.
    Barbosa-Povoa, Ana P.
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2016, 55 (21) : 6236 - 6249
  • [23] SDDP for some interstage dependent risk-averse problems and application to hydro-thermal planning
    Guigues, Vincent
    COMPUTATIONAL OPTIMIZATION AND APPLICATIONS, 2014, 57 (01) : 167 - 203
  • [24] On Risk-Averse Stochastic Semidefinite Programs with Continuous Recourse
    Claus, Matthias
    Schultz, Ruediger
    Spuerkel, Kai
    Wollenberg, Tobias
    VIETNAM JOURNAL OF MATHEMATICS, 2019, 47 (04) : 865 - 879
  • [25] Algorithms for a risk-averse Stackelberg game with multiple adversaries
    Chicoisne, Renaud
    Ordonez, Fernando
    COMPUTERS & OPERATIONS RESEARCH, 2023, 160
  • [26] Dynamic linear programming games with risk-averse players
    Toriello, Alejandro
    Uhan, Nelson A.
    MATHEMATICAL PROGRAMMING, 2017, 163 (1-2) : 25 - 56
  • [27] Risk-Averse Shortest Path Problems
    Gavriel, Christos
    Hanasusanto, Grani
    Kuhn, Daniel
    2012 IEEE 51ST ANNUAL CONFERENCE ON DECISION AND CONTROL (CDC), 2012, : 2533 - 2538
  • [28] Channel bargaining with risk-averse retailer
    Ma, Lijun
    Liu, Fangmei
    Li, Sijie
    Yan, Houmin
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2012, 139 (01) : 155 - 167
  • [29] Risk-averse firms and employment dynamics
    Choudhary, M. Ali
    Levine, Paul
    OXFORD ECONOMIC PAPERS-NEW SERIES, 2010, 62 (03): : 578 - 602
  • [30] A Scalable Approach to Large Scale Risk-Averse Distribution Grid Expansion Planning
    Moreira, Alexandre
    Heleno, Miguel
    Valenzuela, Alan
    Eto, Joseph H.
    Ortega, Jaime
    Botero, Cristina
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2024, 39 (01) : 2115 - 2128