Effective Tools for Projects Delivered by Construction Manager-General Contractor Method

被引:20
|
作者
West, Nicola [1 ]
Gransberg, Douglas D. [1 ]
McMinimee, James [2 ]
机构
[1] Iowa State Univ, Dept Civil Construct & Environm Engn, Ames, IA 50011 USA
[2] JMC Consulting, Salt Lake City, UT 84103 USA
关键词
D O I
10.3141/2268-05
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction manager general contractor (CMGC) is an alternative project delivery method that is fast becoming more prevalently used to accelerate the delivery of highway projects. FHWA's Every Day Counts program is encouraging state departments of transportation (DOTs) to adopt CMGC as a tool to deliver badly needed rapid renewal projects. As part of the program, a CMGC Peer Exchange conference was held in June 2011 in Salt Lake City, Utah. This paper synthesizes the tools used in implementing CMGC project delivery that were reported in those conference presentations by state DOTs with CMGC experience. That information is compared with similar information found in the literature to document the current state-of-the-practice in CMGC highway project delivery. It is concluded that jointly managing risk and developing a collaborative business climate are the two most important aspects of successful CMGC project delivery.
引用
收藏
页码:33 / 39
页数:7
相关论文
共 21 条
  • [21] A simulation-based method for effective workface planning of industrial construction projects
    Hu, Di
    Mohamed, Yasser
    Taghaddos, Hosein
    Hermann, Ulrich
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2018, 36 (06) : 328 - 347