Study on Bi-level Programming Model for Traffic Control on Massive Activities

被引:0
作者
Zhang, Liangzhi [1 ]
He, Minai [1 ]
机构
[1] Shandong Jiaotong Univ, Dept Traff & Logist Engn, Jinan 250023, Peoples R China
来源
FRONTIERS OF MANUFACTURING AND DESIGN SCIENCE, PTS 1-4 | 2011年 / 44-47卷
关键词
Bi-level programming; Massive activities; Rough set; Traffic control; GA;
D O I
10.4028/www.scientific.net/AMM.44-47.3927
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In the massive activities of cities, rush hour is temporary while hot roads are congested seriously. Traffic flows are unbalanced severely in two aspects of time and space. Traffic control program is key point while few researches put emphasis upon it. In this paper, a bi-level programming model to make traffic control measure is brought forward. In upper level, providing key member with high transportation service is first thought over, and then the sum of travel delay of the masses and cost of traffic control is minimized. In lower level, evacuation delay of activities personnel is designed to ensure no traffic jam emerged. Rough set genetic algorithm is employed to solving bi-level programming problem in the paper, and an example of traffic control to massive activity verifies the validity of the proposed model.
引用
收藏
页码:3927 / 3931
页数:5
相关论文
共 8 条
  • [1] An Zhiqiang, 2004, URBAN PLANNING FORUM, V4, P40
  • [2] Hou li-wen, 2002, Journal of System Simulation, V14, P664
  • [3] Jiang Guiyan, 2008, URBAN TRANSPORT CHIN, V6, P59
  • [4] Wang Xiaoguang, 2009, TEC EC AREA COMM, V4, P4
  • [5] [严新平 YAN Xinping], 2009, [西南交通大学学报, Journal of Southwest Jiaotong University], V44, P112
  • [6] Yang Zhongzhen, 2007, URBAN TRANSPORT CHIN, V5, P81
  • [7] Zhang Liangzhi, 2010, ICMTMA2010, V3, P631
  • [8] Zhao Xiaohui, 2009, MODERN TRANSPORTATIO, V6, P80