Visualizing high-rise building construction strategies using linear scheduling and 4D CAD

被引:62
|
作者
Russell, Alan [1 ]
Staub-French, Sheryl [1 ]
Tran, Ngoc [1 ]
Wong, William [1 ]
机构
[1] Univ British Columbia, Dept Civil Engn, Vancouver, BC V6T 1Z4, Canada
关键词
4D CAD; Linear scheduling; Product modeling; Three-dimensional models; Building information models; Scheduling; Visualization;
D O I
10.1016/j.autcon.2008.08.001
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Project teams face ever increasing pressure to deliver projects as quickly as possible. To meet these demands, contractors are faced with the need to explore various construction strategies in order to meet delivery dates, and to assure themselves as to the achievability and quality of a schedule. Various visual representations of a project's schedule and associated information combined with visual representations of the project in progress, i.e. 4D CAD, can assist with these tasks of identifying effective construction strategies for shortening project duration, assessing their workability, and judging schedule quality. Such visual representations aid communication amongst project staff and facilitate brain-storming, and, implemented well they can provide clear. fast, and multi-climensional feedback to the project team. In this paper, we describe aspects of our work which is directed at formulating a dynamic visualization environment that links 3D CAD, a generalization of traditional CPM which embraces linear scheduling, dual product representations (scheduling and CAD system) and their mapping onto each other, and schedule and CAD graphics in a manner which facilitates the relatively rapid exploration of alternative construction method and scheduling strategies for large scale linear projects (e.g. high-rise buildings, bridges, etc.). Requirements of such an environment include quickness, treating scale, working at multiple levels of detail, dealing with design variability. and realistic representation of the work. Use is made of a realistic example to highlight aspects of our approach and identify important issues that must be addressed if a visualization environment useful for construction professionals is to be developed. (C) 2008 Elsevier B.V. All rights reserved.
引用
收藏
页码:219 / 236
页数:18
相关论文
共 30 条
  • [21] Simulation-Based Schedule Estimation Model for ACS-Based Core Wall Construction of High-Rise Building
    Hong, Taehoon
    Cho, Kyuman
    Hyun, Changtaek
    Han, Seungwoo
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (06): : 393 - 402
  • [22] 4D CAD-based evaluation system for crane deployment plans in construction of nuclear power plants
    Sugimoto, Y.
    Seki, H.
    Samo, T.
    Nakamitsu, N.
    AUTOMATION IN CONSTRUCTION, 2016, 71 : 87 - 98
  • [23] AR-based 4D CAD system using marker and markerless recognition method
    Kim, Hyeoun-Seong
    Sangmi-Park
    Sunju-Han
    Kang, Leen-Seok
    CREATIVE CONSTRUCTION CONFERENCE 2017, CCC 2017, 2017, 196 : 29 - 35
  • [24] Visualization and metrics analysis of wind environments of typical high-rise residential building cluster configurations using CFD and image processing
    He, Yi
    Chu, Yingnan
    Song, Yehao
    Liu, Mengjia
    Shi, Shaohang
    Chen, Xinxing
    Gao, Weizhi
    JOURNAL OF VISUALIZATION, 2023, 26 (06) : 1211 - 1232
  • [25] Visualization and metrics analysis of wind environments of typical high-rise residential building cluster configurations using CFD and image processing
    Yi He
    Yingnan Chu
    Yehao Song
    Mengjia Liu
    Shaohang Shi
    Xinxing Chen
    Weizhi Gao
    Journal of Visualization, 2023, 26 : 1211 - 1232
  • [26] Appearance-based material classification for monitoring of operation-level construction progress using 4D BIM and site photologs
    Han, Kevin K.
    Golparvar-Fard, Mani
    AUTOMATION IN CONSTRUCTION, 2015, 53 : 44 - 57
  • [27] Improvement of Realism of 4D Objects Using Augmented Reality Objects and Actual Images of a Construction Site
    Kim, Hyeon Seung
    Kim, Sung-Keun
    Borrmann, Andre
    Kang, Leen Seok
    KSCE JOURNAL OF CIVIL ENGINEERING, 2018, 22 (08) : 2735 - 2746
  • [28] Improvement of Realism of 4D Objects Using Augmented Reality Objects and Actual Images of a Construction Site
    Hyeon Seung Kim
    Sung-Keun Kim
    Andre Borrmann
    Leen Seok Kang
    KSCE Journal of Civil Engineering, 2018, 22 : 2735 - 2746
  • [29] Site logistics planning and control for engineer-to-order prefabricated building systems using BIM 4D modeling
    Bortolini, Rafaela
    Formoso, Carlos Torres
    Viana, Daniela D.
    AUTOMATION IN CONSTRUCTION, 2019, 98 : 248 - 264
  • [30] A Technique for Cloud Based Clustering and Spatial Resource Reuse and Scheduling of 3D In-Building Small Cells Using CoMP for High Capacity CRAN
    Saha, Rony Kumer
    Nanba, Shinobu
    Nishimura, Kosuke
    IEEE ACCESS, 2018, 6 : 71602 - 71621