Feasibility of a 1,400 m Span Steel Cable-Stayed Bridge

被引:52
|
作者
Nagai, Masatsugu [1 ]
Fujino, Yozo [2 ]
Yamaguchi, Hiroki [3 ]
Iwasaki, Eiji [1 ]
机构
[1] Nagaoka Univ Technol, Dept Civil & Environm Engn, Nagaoka, Niigata 9402188, Japan
[2] Univ Tokyo, Dept Civil Engn, Tokyo 1138656, Japan
[3] Saitama Univ, Dept Civil & Environm Engn, Saitama 3388570, Japan
关键词
Project feasibility; Bridges; cable-stayed; steel; suspension;
D O I
10.1061/(ASCE)1084-0702(2004)9:5(444)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper describes the feasibility of 1,400 m steel cable-stayed bridges from both structural and economic viewpoints. Because the weight of a steel girder strongly affects the total cost of the bridge, the writers present a procedure to obtain a minimum weight for a girder that ensures safety against static and dynamic instabilities. For static instability, elastoplastic, finite-displacement analysis under in-plane load and elastic, finite-displacement analysis under displacement-dependent wind load are conducted; for dynamic instability, multimodal flutter analysis is carried out. It is shown that static critical wind velocity of lateral torsional buckling governs the dimension of the girder. Finally, the writers briefly compare a cable-stayed bridge with suspension bridge alternatives.
引用
收藏
页码:444 / 452
页数:9
相关论文
共 50 条
  • [1] Rande Bridge Widening: A 400-m-Span Cable-Stayed Bridge Expansion
    Bernardo, Hector
    Tarquis, Felipe
    Lucas, Conchita
    Viartola, Luis Miguel
    PRACTICE PERIODICAL ON STRUCTURAL DESIGN AND CONSTRUCTION, 2019, 24 (04)
  • [2] CONVERSION OF A SUSPENSION BRIDGE INTO A CABLE-STAYED BRIDGE
    BUCKLAND, PG
    MORGENSTERN, BD
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 1991, 18 (02) : 273 - 281
  • [3] A Landmark: Multi-Span Steel Arch/Cable-Stayed Pedestrian Bridge
    Qousi, Lana
    Koblawi, Ahmad
    Chitale, Dev
    Cesario, Samantha
    Cabitac, Hallie
    Abdelsayed, Michael
    Salib, Sameh
    Sennah, Khaled
    PROCEEDINGS OF THE CANADIAN SOCIETY FOR CIVIL ENGINEERING ANNUAL CONFERENCE 2023, VOL 11, CSCE 2023, 2024, 505 : 441 - 456
  • [4] Design and Experimental Study of a Harp-Shaped Single Span Cable-Stayed Bridge
    Shao, Xudong
    Zhao, Hua
    Li, Lifeng
    Peng, Wanghu
    Liu, Guangdong
    Yan, Banfu
    JOURNAL OF BRIDGE ENGINEERING, 2005, 10 (06) : 658 - 665
  • [5] On the collapse of the Nienburg cable-stayed road bridge
    Birnstiel, C.
    BRIDGE STRUCTURES, 2013, 9 (2-3) : 83 - 100
  • [6] Aerodynamic characteristics of a long-span cable-stayed bridge under construction
    Ma, Cunming
    Duan, Qingsong
    Li, Qiusheng
    Liao, Haili
    Tao, Qi
    ENGINEERING STRUCTURES, 2019, 184 : 232 - 246
  • [7] Disproportionate collapse of a cable-stayed bridge
    Domaneschi, Marco
    Cimellaro, Gian Paolo
    Scutiero, Gianluca
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-BRIDGE ENGINEERING, 2019, 172 (01) : 13 - 26
  • [8] Analysis of cable-stayed concrete filled steel tube arch bridge
    Yan, Y.
    Xu, H. Y.
    Shang, G. X.
    Ren, L.
    ISISS '2007: PROCEEDINGS OF THE INNOVATION AND SUSTAINABILITY OF STRUCTURES, VOLS 1 AND 2, 2008, : 119 - 124
  • [9] Seismic analysis and design of the skytrain cable-stayed bridge
    Khalil, MS
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 1996, 23 (06) : 1241 - 1248
  • [10] Geometrically nonlinear buffeting response of a cable-stayed bridge
    Kim, HK
    Shinozuka, M
    Chang, SP
    JOURNAL OF ENGINEERING MECHANICS, 2004, 130 (07) : 848 - 857