An improved shuffled complex evolution algorithm with sequence mapping mechanism for job shop scheduling problems

被引:30
|
作者
Zhao, Fuqing [1 ,3 ]
Zhang, Jianlin [1 ]
Zhang, Chuck [2 ]
Wang, Junbiao [3 ]
机构
[1] Lanzhou Univ Technol, Sch Comp & Commun Technol, Lanzhou 730050, Peoples R China
[2] Georgia Inst Technol, H Milton Stewart Sch Ind & Syst Engn, Atlanta, GA 30332 USA
[3] Northwestern Polytech Univ, Minist Educ, Key Lab Contemporary Design & Integrated Mfg Tech, Xian 710072, Peoples R China
基金
中国国家自然科学基金;
关键词
Job shop scheduling; Shuffled complex evolution; Job permutation; Sequence mapping mechanism; PARTICLE SWARM OPTIMIZATION; ANT COLONY OPTIMIZATION; GLOBAL OPTIMIZATION; GENETIC ALGORITHM; SETUP TIMES; SPACE;
D O I
10.1016/j.eswa.2015.01.007
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The job shop problem is an important part of scheduling in the manufacturing industry. A new intelligent algorithm named Shuffled Complex Evolution (SCE) algorithm is proposed in this paper with the aim of getting the minimized makespan. The sequence mapping mechanism is used to change the variables in the continuous domain to discrete variables in the combinational optimization problem; the sequence, which is based on job permutation, is adopted for encoding mechanism and sequence insertion mechanism for decoding. While considering that the basic SCE algorithm has the drawbacks of poor solution and lower rate of convergence, a new strategy is used to change the individual's evolution in the basic SCE algorithm. The strategy makes the new individual closer to best individual in the current population. The improved SCE algorithm (ISCE) was used to solve the typical job shop problems and the results show that the improved algorithm is effective to the job shop scheduling. (C) 2015 Elsevier Ltd. All rights reserved.
引用
收藏
页码:3953 / 3966
页数:14
相关论文
共 50 条
  • [11] Algorithm Based on Improved Genetic Algorithm for Job Shop Scheduling Problem
    Chen, Xiaohan
    Zhang, Beike
    Gao, Dong
    2019 IEEE INTERNATIONAL CONFERENCE ON MECHATRONICS AND AUTOMATION (ICMA), 2019, : 951 - 956
  • [12] An improved genetic algorithm for Job-shop scheduling problem
    Lou Xiao-fang
    Zou Feng-xing
    Gao Zheng
    Zeng Ling-li
    Ou Wei
    CCDC 2009: 21ST CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-6, PROCEEDINGS, 2009, : 2595 - +
  • [13] Solving flexible job shop scheduling problems with transportation time based on improved genetic algorithm
    Zhang, Guohui
    Sun, Jinghe
    Liu, Xing
    Wang, Guodong
    Yang, Yangyang
    MATHEMATICAL BIOSCIENCES AND ENGINEERING, 2019, 16 (03) : 1334 - 1347
  • [14] A shuffled frog-leaping algorithm for job shop scheduling with outsourcing options
    Lei, Deming
    Guo, Xiuping
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (16) : 4793 - 4804
  • [15] An improved artificial algae algorithm integrated with differential evolution for job-shop scheduling problem
    Ibrahim, Abdelmonem M.
    Tawhid, Mohamed A.
    JOURNAL OF INTELLIGENT MANUFACTURING, 2023, 34 (04) : 1763 - 1778
  • [16] A neighborhood for complex job shop scheduling problems with regular objectives
    Burgy, Reinhard
    JOURNAL OF SCHEDULING, 2017, 20 (04) : 391 - 422
  • [17] An effective shuffled frog-leaping algorithm for multi-objective flexible job shop scheduling problems
    Li, Junqing
    Pan, Quanke
    Xie, Shengxian
    APPLIED MATHEMATICS AND COMPUTATION, 2012, 218 (18) : 9353 - 9371
  • [18] Shuffled complex evolution coupled with stochastic ranking for reservoir scheduling problems
    Mao, Jing-qiao
    Tian, Ming-ming
    Hu, Teng-fei
    Ji, Kang
    Dai, Ling-quan
    Dai, Hui-chao
    WATER SCIENCE AND ENGINEERING, 2019, 12 (04) : 307 - 318
  • [19] Solving the job shop scheduling problems by an immune algorithm
    Zuo, XQ
    Fan, YS
    PROCEEDINGS OF 2005 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-9, 2005, : 3282 - 3287
  • [20] A hybrid genetic algorithm for the job shop scheduling problems
    Park, BJ
    Choi, HR
    Kim, HS
    COMPUTERS & INDUSTRIAL ENGINEERING, 2003, 45 (04) : 597 - 613