Disassembly and Reassembly Sequence Planning Tradeoffs Under Uncertainty for Product Maintenance

被引:30
作者
Behdad, Sara [1 ]
Thurston, Deborah [1 ]
机构
[1] Univ Illinois, Ind & Enterprise Syst Engn Dept, Urbana, IL 61801 USA
基金
美国国家科学基金会;
关键词
INTEGRATED APPROACH; OPTIMIZATION; METHODOLOGY; PARTS;
D O I
10.1115/1.4006262
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
The problem addressed in this paper is disassembly sequence planning for the purposes of maintenance or component upgrading, which is an integral part of the remanufacturing process. This involves disassembly, component repair or replacement, and reassembly. Each of these steps incurs cost as well as the probability of damage during the process. This paper presents a method for addressing these tradeoffs, as well as the uncertainty associated with them. A procedure for identifying the best sequence of disassembly operations for maintenance and/or component upgrade is presented. It considers both disassembly and reassembly costs and uncertainties. Graph-based integer linear programming combined with multi-attribute utility analysis is employed to identify the best set of tradeoffs among (a) disassembly time (and resulting cost) under uncertainty, (b) the probability of not incurring damage during disassembly, (c) reassembly time (and resulting cost), and (d) the probability of not incurring damage during reassembly. An example of a solar heating system is used to illustrate the method. [DOI: 10.1115/1.4006262]
引用
收藏
页数:9
相关论文
共 32 条
[1]  
[Anonymous], 2011, NET ZERO ENERGY SOLU
[2]  
Behdad S., 2010, T ASME J MECH DES, V132
[4]   An integrated approach to selective-disassembly sequence planning [J].
Chung, CH ;
Peng, QJ .
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2005, 21 (4-5) :475-485
[5]   A method for dealing with multi-objective optimization problem of disassembly processes [J].
Duta, L ;
Filip, FG ;
Henrioud, JM .
PROCEEDINGS OF THE 2003 IEEE INTERNATIONAL SYMPOSIUM ON ASSEMBLY AND TASK PLANNING (ISATP2003), 2003, :163-168
[6]  
Fischer J, 2005, INTEGRATING HUMAN ASPECTS IN PRODUCTION MANAGEMENT, P147
[7]  
Gao JG, 2003, IEEE INT SYMP ELECTR, P54
[8]   Integrated approach for disassembly processes generation and recycling evaluation of an end-of-life product [J].
Gerner, S ;
Kobeissi, A ;
David, B ;
Binder, Z ;
Descotes-Genon, B .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2005, 43 (01) :195-222
[9]   Disassembly planning of mechanical systems for service and recovery: a genetic algorithms based approach [J].
Giudice, Fabio ;
Fargione, Giovanna .
JOURNAL OF INTELLIGENT MANUFACTURING, 2007, 18 (03) :313-329
[10]   Disassembly sequence planning for products with defective parts in product recovery [J].
Gungor, A ;
Gupta, SM .
COMPUTERS & INDUSTRIAL ENGINEERING, 1998, 35 (1-2) :161-164