An efficient computational strategy for robust maintenance scheduling: Application to corroded pipelines

被引:0
作者
Patelli, E. [1 ]
de Angelis, M. [1 ]
机构
[1] Univ Liverpool, Inst Risk & Uncertainty, Chadwick Bldg, Liverpool, Merseyside, England
来源
SAFETY AND RELIABILITY - SAFE SOCIETIES IN A CHANGING WORLD | 2018年
基金
英国工程与自然科学研究理事会;
关键词
UNCERTAINTY MANAGEMENT; PROBABILITIES;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The ability to predict correctly the future remaining life time of components is of paramount importance to improve the safety and reliability of systems and networks via an effective maintenance policy. However, simplifications and assumptions are usually adopted to compensate lack of data, imprecision and vagueness, which cannot be justified completely and may, thus lead to biased results. To overcome these issues, an imprecise probabilities approach is proposed for reliability analysis and risk-based maintenance strategy. A novel efficient computational approach is proposed for identifying robust maintenance strategies. The optimal solution is obtained through only one reliability assessment based on Advanced Line Sampling and reusing the outcome of maintenance activities in a force Monte Carlo approach. The proposed methodology remove the huge computational cost of reliability-base optimization making the analysis of industrial size problem feasible. The applicability of the approach is demonstrated by identifying the optimal maintenance policy of buried pipelines and it is shown how this approach can improve the current industrial practice.
引用
收藏
页码:2201 / 2209
页数:9
相关论文
共 33 条
  • [11] Special issue of Mechanical Systems and Signal Processing "Imprecise probabilities-What can they add to engineering analyses?" Foreword
    Beer, Michael
    Ferson, Scott
    [J]. MECHANICAL SYSTEMS AND SIGNAL PROCESSING, 2013, 37 (1-2) : 1 - 3
  • [12] A study on the reliability assessment methodology for pipelines with active corrosion defects
    Caleyo, F
    González, JL
    Hallen, JM
    [J]. INTERNATIONAL JOURNAL OF PRESSURE VESSELS AND PIPING, 2002, 79 (01) : 77 - 86
  • [13] de Angelis M., 2014, Vulnerability, Uncertainty, and Risk. Quantification, Mitigation, and Management. Second International Conference on Vulnerability and Risk Analysis and Management (ICVRAM) and the Sixth International Symposium on Uncertainty Modeling and Analysis (ISUMA). Proceedings, P915
  • [14] Advanced Line Sampling for efficient robust reliability analysis
    de Angelis, Marco
    Patelli, Edoardo
    Beer, Michael
    [J]. STRUCTURAL SAFETY, 2015, 52 : 170 - 182
  • [15] UPPER AND LOWER PROBABILITIES INDUCED BY A MULTIVALUED MAPPING
    DEMPSTER, AP
    [J]. ANNALS OF MATHEMATICAL STATISTICS, 1967, 38 (02): : 325 - &
  • [16] EHIMWENMA K, 2014, MAINTENANCE SAFETY A, P122, DOI DOI 10.1109/ICALT.2014.43
  • [17] On the treatment of uncertainties and probabilities in engineering decision analysis
    Faber, MH
    [J]. JOURNAL OF OFFSHORE MECHANICS AND ARCTIC ENGINEERING-TRANSACTIONS OF THE ASME, 2005, 127 (03): : 243 - 248
  • [18] Ferson S., 2003, Sandia National Laboratories, Technical reports SANDD2002-4015
  • [19] Optimal inspection planning for onshore pipelines subject to external corrosion
    Gomes, Wellison J. S.
    Beck, Andre T.
    Haukaas, Terje
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2013, 118 : 18 - 27
  • [20] Klever F.J, 1995, INT C OFFSH MECH ARC