Casing Cementing with Internal Pre-pressurization for Thermal Recovery Wells

被引:1
|
作者
Ll, Z. -F. [1 ,2 ]
机构
[1] Yanshan Univ, Qinhuangdao, Hebei, Peoples R China
[2] China Univ Geosci, Wuhan, Peoples R China
来源
关键词
Cementing (shafts) - Crude oil - Heavy oil production - Thermal oil recovery - Pressurization - Cements - Recovery;
D O I
10.2118/08-12-44
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Thermal recovery is a very common and effective method for producing heavy oil. Casing failure is a very serious problem in thermal recovery wells. In some oilfields, more than 95% of the casing for thermal recovery wells failed due to thermal stresses. In the steam injection process, the casing is heated by steam. The change in casing temperature produces thermal stresses. The casing deforms when stresses exceed the yield point of its material. If using conventional cementing technology for thermal recovery wells, the casing will deform as a result of thermal stresses as a result of the steam injection process. Conventional technologies used to protect thermal recovery well casing from failure are theoretically ineffective. Casing cementing with internal pre-pressurization for thermal recovery wells refers to the exertion of inner pressure on payzone production casing to make payzone production casing expand in the cement solidifying period. Calculations show that casing with internal pre-pressurization technology achieves a greater safety coefficient during the whole production cycle and results in no plastic deformation. This technology will be an important method to prolong thermal recovery well casing life.
引用
收藏
页码:44 / 49
页数:6
相关论文
共 50 条
  • [1] Casing cementing with half warm-up for thermal recovery wells
    Li, Zifeng
    JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING, 2008, 61 (2-4) : 94 - 98
  • [2] Thermodynamic performance of pre-pressurization in a cryogenic tank
    Liu, Zhan
    Li, Yanzhong
    Jin, Yonghua
    Li, Cui
    APPLIED THERMAL ENGINEERING, 2017, 112 : 801 - 810
  • [3] Pre-expansion technique to protect casing from thermal failure in thermal recovery wells
    Li, Zifeng
    Yang, Xinjun
    Wang, Zhaoyun
    Tian, Xinmin
    Guti Lixue Xuebao/Acta Mechanica Solida Sinica, 2009, 30 (02): : 162 - 169
  • [4] Effects of pre-pressurization on blast response of clamped aluminum plates
    Veldman, RL
    Ari-Gur, J
    Clum, C
    DeYoung, A
    Folkert, J
    INTERNATIONAL JOURNAL OF IMPACT ENGINEERING, 2006, 32 (10) : 1678 - 1695
  • [5] TEMPERATURE ANOMALIES IN WELLS DUE TO CEMENTING OF CASING
    GRETENER, PE
    JOURNAL OF PETROLEUM TECHNOLOGY, 1968, 20 (02): : 147 - &
  • [6] Effects of pre-pressurization on damage of blast-loaded reinforced plates
    Veldman, R. L.
    Ari-Gur, J.
    Clum, C.
    Proceedings of the ASME Applied Mechanics Division, 2005, 256 : 103 - 111
  • [7] Plastic limit analysis of defective casing for thermal recovery wells
    Zhu, Xiaohua
    Liu, Shaohu
    Tong, Hua
    ENGINEERING FAILURE ANALYSIS, 2013, 27 : 340 - 349
  • [8] Critical Heat Flux Phenomena Depending on Pre-pressurization in Transient Heat Input
    Park, Jongdoc
    Fukuda, Katsuya
    Liu, Qiusheng
    PROCEEDING OF THE 3RD INTERNATIONAL CONFERENCE OF GLOBAL NETWORK FOR INNOVATIVE TECHNOLOGY 2016 (3RD IGNITE-2016): ADVANCED MATERIALS FOR INNOVATIVE TECHNOLOGIES, 2017, 1865
  • [9] Introducing pre-pressurization/depressurization grooves to diminish flow fluctuations of a rotary energy recovery device: Numerical simulation and validating experiment
    Wang, Yue
    Duan, Yawei
    Zhou, Jie
    Xu, Shichang
    Wang, Shichang
    DESALINATION, 2017, 413 : 1 - 9
  • [10] Simulating experiment of casing cementing with pre-expansion
    Yang, Xin-Jun
    Li, Zi-Feng
    Wang, Zhao-Yun
    Tian, Xin-Min
    Gongcheng Lixue/Engineering Mechanics, 2010, 27 (06): : 223 - 227