A new double flexible job-shop scheduling problem integrating processing time, green production, and human factor indicators

被引:128
作者
Gong, Guiliang [1 ]
Deng, Qianwang [1 ]
Gong, Xuran [1 ]
Liu, Wei [1 ]
Ren, Qinghua [1 ]
机构
[1] Hunan Univ, State Key Lab Adv Design & Mfg Vehicle Body, Changsha, Hunan, Peoples R China
基金
中国国家自然科学基金;
关键词
Double flexible job shop scheduling problem; Green production indicators; Human factors; Multi-objective optimization; Hybrid genetic algorithm; ENERGY-CONSUMPTION; POWER-CONSUMPTION; ERGONOMICS; MINIMIZE; SYSTEM; MODEL; OPTIMIZATION; ALGORITHMS; PRINCIPLES; TARDINESS;
D O I
10.1016/j.jclepro.2017.10.188
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In this paper, we propose an original double flexible job-shop scheduling problem (DFJSP), in which both workers and machines are flexible. Because of the characteristics of double flexibility, DFJSP conforms to practical production better than the flexible job-shop scheduling problem (FJSP). In addition, a multi objective optimization mathematic model according to the DFJSP is proposed, which is concerned with the processing time indicator that is usually optimized by most existing studies; green production indicators, namely, factors regarding environmental protection; and human factor indicators, which are actual indispensable elements that exist in the production system. Furthermore, ten benchmarks of DFJSP are presented and solved using a newly proposed hybrid genetic algorithm (NHGA). With the proposed NHGA, a new well-designed three-layer chromosome encoding method and some effective crossover and mutation operators are developed. To obtain the best combination of key parameters in NHGA, the Taguchi design of experiment method is used for their evaluation. Finally, comparisons between NHGA and NSGA-II show that the proposed NHGA has advantages in terms of the solving accuracy and efficiency of the DFJSP, particularly at a large scale. It would be beneficial to apply our proposed model to the multi-objective optimization of scheduling problems, especially those considering human factor and green production-related indicators. (C) 2017 Elsevier Ltd. All rights reserved.
引用
收藏
页码:560 / 576
页数:17
相关论文
共 57 条
[1]  
[Anonymous], 2008, Worldwide trends in energy use and efficiency. Key insights from IEA indicator analysis
[2]   Learning curve models and applications: Literature review and research directions [J].
Anzanello, Michel Jose ;
Fogliatto, Flavio Sanson .
INTERNATIONAL JOURNAL OF INDUSTRIAL ERGONOMICS, 2011, 41 (05) :573-583
[3]   Dynamic cell formation and the worker assignment problem: a new model [J].
Aryanezhad, M. B. ;
Deljoo, V. ;
Mirzapour Al-e-hashem, S. M. J. .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 41 (3-4) :329-342
[4]   Considering skills evolutions in multi-skilled workforce allocation with flexible working hours [J].
Attia, El-Awady ;
Duquenne, Philippe ;
Le-Lann, Jean-Marc .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (15) :4548-4573
[5]   Human related issues in manufacturing cell design, implementation, and operation: a review and survey [J].
Bidanda, B ;
Ariyawongrat, P ;
Needy, KL ;
Norman, BA ;
Tharmmaphornphilas, W .
COMPUTERS & INDUSTRIAL ENGINEERING, 2005, 48 (03) :507-523
[6]   On the Interface between Operations and Human Resources Management [J].
Boudreau, John ;
Hopp, Wallace ;
McClain, John O. ;
Joseph Thomas, L. .
Manufacturing and Service Operations Management, 2003, 5 (03) :179-202
[7]  
Brandimarte P., 1993, Annals of Operations Research, V41, P157, DOI 10.1007/BF02023073
[8]   JOB-SHOP SCHEDULING WITH MULTIPURPOSE MACHINES [J].
BRUCKER, P ;
SCHLIE, R .
COMPUTING, 1990, 45 (04) :369-375
[9]   A tutorial survey of job-shop scheduling problems using genetic algorithms .1. Representation [J].
Cheng, RW ;
Gen, M ;
Tsujimura, Y .
COMPUTERS & INDUSTRIAL ENGINEERING, 1996, 30 (04) :983-997
[10]   PRINCIPLES OF SOCIOTECHNICAL DESIGN [J].
CHERNS, A .
HUMAN RELATIONS, 1976, 29 (08) :783-792