Energy-efficient collaborative scheduling of heterogeneous multi-stage hybrid flowshop for large metallic component manufacturing

被引:20
作者
Duan, Jianguo [1 ]
Feng, Mengyu [2 ]
Zhang, Qinglei [1 ]
机构
[1] Shanghai Maritime Univ, China Inst FTZ Supply Chain, Shanghai 201306, Peoples R China
[2] Shanghai Maritime Univ, Inst Logist Sci & Engn, Shanghai 201306, Peoples R China
关键词
Large metallic components; Collaborative scheduling; NSGA-II; Moth -flame optimization algorithm; ALGORITHM;
D O I
10.1016/j.jclepro.2022.134148
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Green manufacturing is attracting more attention. The manufacturing of large metallic components is high-energy-consuming and high-polluting. It usually involves heterogeneous processes: such as cutting stock, welding assembly, and machining, and produces a great number of carbon emissions. In addition, large metallic components have many specifications of parts, which is prone to the problem of kitting. According to the manufacturing process characteristics of large metallic components and considering the turn on/off strategy of machines, a collaborative scheduling model aiming at minimizing makespan and carbon emissions is con-structed. In order to find the Pareto optimal solutions of the problem, an improved NSGA-II combined with the moth-flame optimization algorithm (NSGA-II-MFO) is proposed. Finally, examples with different scales are designed to evaluate the effectiveness of the mathematical model and algorithm. Furthermore, the proposed model and algorithm are also verified on a real-world case from a multi-stage manufacturing workshop in a Chinese excavator factory, which produces a series of excavator boom. The results show that the collaborative scheduling of multi-stage manufacturing flowshop for large metallic components is significantly better than the non-collaborative workshop. At the same time, comparing with 3 other multi-objective optimization algorithms, it also demonstrates the effectiveness of the proposed algorithm in solving such problems.
引用
收藏
页数:14
相关论文
共 37 条
[1]   Green scheduling to achieve green manufacturing: Pursuing a research agenda by mapping science [J].
Alvarez-Meaza, Izaskun ;
Zarrabeitia-Bilbao, Enara ;
Rio-Belver, Rosa-Maria ;
Garechana-Anacabe, Gaizka .
TECHNOLOGY IN SOCIETY, 2021, 67
[2]   Flow shop scheduling with heterogeneous workers [J].
Benavides, Alexander J. ;
Ritt, Marcus ;
Miralles, Cristobal .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 237 (02) :713-720
[3]   Inverse scheduling: two-machine flow-shop problem [J].
Brucker, Peter ;
Shakhlevich, Natalia V. .
JOURNAL OF SCHEDULING, 2011, 14 (03) :239-256
[4]   A Job-Shop Scheduling Decision-Making Model for Sustainable Production Planning With Power Constraint [J].
Carlucci, Daniela ;
Renna, Paolo ;
Materi, Sergio .
IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2023, 70 (05) :1923-1932
[5]   Optimal Scheduling of Human-Robot Collaborative Assembly Operations With Time Petri Nets [J].
Casalino, Andrea ;
Zanchettin, Andrea Maria ;
Piroddi, Luigi ;
Rocco, Paolo .
IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2021, 18 (01) :70-84
[6]   Cleaner Production in the textile industry and its relationship to sustainable development goals [J].
de Oliveira Neto, Geraldo Cardoso ;
Ferreira Correia, Jose Manoel ;
Silva, Paulo Cesar ;
de Oliveira Sanches, Ariane Gaiola ;
Lucato, Wagner Cezar .
JOURNAL OF CLEANER PRODUCTION, 2019, 228 :1514-1525
[7]   Sustainable scheduling optimization of mixed-line production for large marine power components [J].
Duan, Jian-guo ;
Zhang, Qing-lei ;
Zhou, Ying ;
Wang, Yan-sen .
JOURNAL OF CLEANER PRODUCTION, 2021, 280
[8]   Energy-efficient scheduling for a flexible job shop with machine breakdowns considering machine idle time arrangement and machine speed level selection [J].
Duan, Jianguo ;
Wang, Jiahui .
COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 161
[9]   Integrated intelligent green scheduling of sustainable flexible workshop with edge computing considering uncertain machine state [J].
Feng, Yixiong ;
Hong, Zhaoxi ;
Li, Zhiwu ;
Zheng, Hao ;
Tan, Jianrong .
JOURNAL OF CLEANER PRODUCTION, 2020, 246
[10]   Assembly flowshop scheduling problem: Speed-up procedure and computational evaluation [J].
Fernandez-Viagas, Victor ;
Talens, Carla ;
Framinan, Jose M. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 299 (03) :869-882