Multi-skill project scheduling with skill evolution and cooperation effectiveness

被引:6
|
作者
Li, Qian [1 ]
Sun, Qinshan [1 ]
Tao, Sha [1 ]
Gao, Xinglin [2 ]
机构
[1] Nanjing Univ, Sch Management & Engn, Nanjing, Peoples R China
[2] Hong Kong Zhuhai Macao Bridge Author, Zhuhai, Peoples R China
基金
中国国家自然科学基金;
关键词
Organization; Optimization; Scheduling; Construction planning; WORKFORCE ALLOCATION; STAFF ASSIGNMENT; HUMAN-RESOURCES; MODEL; TEAM; ALGORITHM; PERFORMANCE;
D O I
10.1108/ECAM-06-2019-0294
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose Recently, there has been increasing focus on the development of multi-skilled workforce in project management. The purpose of this paper is to investigate a multi-skill project scheduling problem (MSPSP), which combines project scheduling and multi-skill personnel assignment. The distinct features of skill evolution and cooperation effectiveness are considered in the problem to maximize the total project effectiveness and skill development simultaneously. Design/methodology/approach The Bi-objective non-linear integer programming (LIP) models are formulated for the problem using three types of skill development objective function: number of experts, total skill increment and "bottleneck" skill increment. Non-linear models are then linearized through several linearization techniques, and the epsilon-constraint method is used to convert the bi-objective models into single-objective models. Findings A construction project case is used to validate the proposed models. In comparison with models that do not consider skill evolution and cooperation effectiveness, the models proposed in this paper offer more realistic solutions and show better performance with regard to both project effectiveness and skill development. Originality/value This research extends the current MSPSP by considering skill evolution based on the "learning effect" as well as the influence of cooperation in an activity-based team, which are common phenomena in practice but seldom studied. LIP models formulated in this paper can be solved by any off-the-shelf optimization solver, such as CPLEX. Besides, the proposed LIP models can offer better project scheduling and personnel assignment plan, which would be of immense practical value in project management applications.
引用
收藏
页码:2023 / 2045
页数:23
相关论文
共 50 条
  • [41] Multi-Objective Multi-Skill Resource-Constrained Project Scheduling Problem Under Time Uncertainty
    Arman Ghamginzadeh
    Amir Abbas Najafi
    Mohammad Khalilzadeh
    International Journal of Fuzzy Systems, 2021, 23 : 518 - 534
  • [42] Solving a real-life multi-skill resource-constrained multi-project scheduling problem
    Torba, Rahman
    Dauzere-Peres, Stephane
    Yugma, Claude
    Gallais, Cedric
    Pouzet, Juliette
    ANNALS OF OPERATIONS RESEARCH, 2024, 338 (01) : 69 - 114
  • [43] A discrete oppositional multi-verse optimization algorithm for multi-skill resource constrained project scheduling problem
    Zhu, Lei
    Lin, Jian
    Wang, Zhou-Jing
    APPLIED SOFT COMPUTING, 2019, 85
  • [44] Multi-Objective Evolutionary for Multi-Skill Health Care Tasks Scheduling
    Ben Othman, Sarah
    Hammadi, Slim
    Quilliot, Alain
    IFAC PAPERSONLINE, 2015, 48 (03): : 704 - 709
  • [45] Teaching–learning-based optimization algorithm for multi-skill resource constrained project scheduling problem
    Huan-yu Zheng
    Ling Wang
    Xiao-long Zheng
    Soft Computing, 2017, 21 : 1537 - 1548
  • [46] Scheduling multi-skill technicians and reassignable tasks in a cloud computing company
    Jin, Shuang
    Tao, Jiaming
    Lai, Minghui
    Hu, Qian
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2025, 321 (03) : 717 - 733
  • [47] A genetic programming hyper-heuristic approach for the multi-skill resource constrained project scheduling problem
    Lin, Jian
    Zhu, Lei
    Gao, Kaizhou
    EXPERT SYSTEMS WITH APPLICATIONS, 2020, 140
  • [48] Co-Evolutionary Algorithm solving Multi-Skill Resource-Constrained Project Scheduling Problem
    Myszkowski, Pawel B.
    Laszczyk, Maciej
    Kalinowski, Dawid
    PROCEEDINGS OF THE 2017 FEDERATED CONFERENCE ON COMPUTER SCIENCE AND INFORMATION SYSTEMS (FEDCSIS), 2017, : 75 - 82
  • [49] A Constraint Programming Approach to Solve Multi-skill Resource-constrained Project Scheduling Problem with Calendars
    Nikaeen, R.
    Najafi, A.A.
    International Journal of Engineering, Transactions B: Applications, 2022, 35 (08):
  • [50] Teaching-learning-based optimization algorithm for multi-skill resource constrained project scheduling problem
    Zheng, Huan-yu
    Wang, Ling
    Zheng, Xiao-long
    SOFT COMPUTING, 2017, 21 (06) : 1537 - 1548