Metaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup times

被引:43
作者
Lin, Shih-Wei [2 ,3 ]
Ying, Kuo-Ching [1 ]
Lee, Zne-Jung [3 ]
机构
[1] Huafan Univ, Dept Ind Engn & Management Informat, Taipei, Taiwan
[2] Chang Gung Univ, Dept Informat Management, Tao Yuan, Taiwan
[3] Huafan Univ, Dept Informat Management, Taipei, Taiwan
关键词
Scheduling; Non-permutation flowline manufacturing cell; Simulated annealing; Genetic algorithm; Tabu search; HEURISTICS; ALGORITHM; SELECTION; PARTS;
D O I
10.1016/j.cor.2007.12.010
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The broad applications of cellular manufacturing make flowline manufacturing cell scheduling problems with sequence dependent family setup times a core topic in the field of scheduling. Due to computational complexity, almost all published studies focus on using permutation schedules to deal with this problem. To explore the potential effectiveness of treating this argument using non-permutation schedules, three prominent types of metaheuristics-a simulated annealing, a genetic algorithm and a tabu search-are proposed and empirically evaluated. The experimental results demonstrate that in general, the improvement made by non-permutation schedules over permutation schedules for the due-date-based performance criteria were significantly better than that for the completion-time-based criteria. The results of this study will provide practitioners a guideline as to when to adopt a non-permutation schedule, which may exhibit better performance with additional computational efforts, (C) 2008 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1110 / 1121
页数:12
相关论文
共 28 条
[1]   SINGLE FACILITY MULTICLASS JOB SCHEDULING [J].
AHN, BH ;
HYUN, JH .
COMPUTERS & OPERATIONS RESEARCH, 1990, 17 (03) :265-272
[2]   A COMPARISON OF SCHEDULING PHILOSOPHIES FOR MANUFACTURING CELLS [J].
ASKIN, RG ;
IYER, A .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1993, 69 (03) :438-449
[3]  
Burbidge J.L., 1971, PRODUCTION ENG, P139
[4]   HEURISTICS FOR OPERATOR SCHEDULING IN GROUP TECHNOLOGY CELLS [J].
CHEN, HG .
COMPUTERS & OPERATIONS RESEARCH, 1995, 22 (03) :261-276
[5]   An algorithm for scheduling batches of parts in a multi-cell flexible manufacturing system [J].
Das, SR ;
Canel, C .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2005, 97 (03) :247-262
[6]   Evolutionary algorithms for scheduling a flowshop manufacturing cell with sequence dependent family setups [J].
França, PM ;
Gupta, JND ;
Mendes, AS ;
Moscato, P ;
Veltink, KJ .
COMPUTERS & INDUSTRIAL ENGINEERING, 2005, 48 (03) :491-506
[7]   An evaluation of group scheduling heuristics in a flow-line manufacturing cell [J].
Frazier, GV .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (04) :959-976
[8]  
Glover F., 1989, ORSA Journal on Computing, V1, P190, DOI [10.1287/ijoc.2.1.4, 10.1287/ijoc.1.3.190]
[9]  
Glover F., 1997, TABU SEARCH
[10]  
Golberg DE., 1989, Choice Reviews Online, V1989, P36, DOI DOI 10.5860/CHOICE.27-0936