Resource-constraint Multi-project Scheduling with Priorities and Uncertain Activity Durations

被引:17
作者
Zheng Zheng [1 ,2 ]
Lin Shumin [2 ]
Guo Ze [2 ]
Zhu Yueni [2 ]
机构
[1] Sci & Technol Aircraft Control Lab, Beijing 100191, Peoples R China
[2] Beihang Univ, Sch Automat Sci & Elect Engn, Beijing 100191, Peoples R China
关键词
Multi-Project Scheduling; Priorities; Robustness; Uncertain Activity Durations; Uncertainty; GENETIC ALGORITHM; NETWORK GENERATOR;
D O I
10.1080/18756891.2013.789152
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Resource-constraint multi-project scheduling is one of the most important topic in the field of project management. Most current works solve this problem based on an idea that multiple projects can be simply emerged into a super-project in a deterministic environment, regardless of the project priority and robustness of schedules. This paper discusses the RCMPSP with priority and formulates a discrete bi-objective decision model. A modified NSGA-II based algorithm is presented to solve the model. Furthermore, we design systematic experiments to investigate the interrelationship between robustness and its related project parameters, including order strength, resource constrainedness and uncertainty level. The results demonstrate the effectiveness of the solution algorithm and show that the three parameters indeed have evident impacts on the robustness and makespan of projects.
引用
收藏
页码:530 / 547
页数:18
相关论文
共 30 条
  • [1] DAGEN: A generator of testsets for project activity nets
    Agrawal, MK
    Elmaghraby, SE
    Herroelen, WS
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 90 (02) : 376 - 382
  • [2] A bi-objective model for robust resource-constrained project scheduling
    Al-Fawzan, MA
    Haouari, M
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2005, 96 (02) : 175 - 187
  • [3] [Anonymous], 2002, P 8 INT WORKSH PROJ
  • [4] [Anonymous], 2003, PhD thesis
  • [5] Resource-constrained multi-project scheduling: Priority rule performance revisited
    Browning, Tyson R.
    Yassine, Ali A.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2010, 126 (02) : 212 - 228
  • [6] The effects of Project Management Information Systems on decision making in a multi project environment
    Caniels, Marjolein C. J.
    Bakens, Ralph J. J. M.
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2012, 30 (02) : 162 - 175
  • [7] Proactive heuristic procedures for robust project scheduling: An experimental analysis
    de Vonder, Stijn Van
    Demeulemeester, Erik
    Herroelen, Willy
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 189 (03) : 723 - 733
  • [8] A fast and elitist multiobjective genetic algorithm: NSGA-II
    Deb, K
    Pratap, A
    Agarwal, S
    Meyarivan, T
    [J]. IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2002, 6 (02) : 182 - 197
  • [9] A RANDOM ACTIVITY NETWORK GENERATOR
    DEMEULEMEESTER, E
    DODIN, B
    HERROELEN, W
    [J]. OPERATIONS RESEARCH, 1993, 41 (05) : 972 - 980
  • [10] RanGen: A random network generator for activity-on-the-node networks
    Demeulemeester, E
    Vanhoucke, M
    Herroelen, W
    [J]. JOURNAL OF SCHEDULING, 2003, 6 (01) : 17 - 38