Long-term generation scheduling of Xiluodu and Xiangjiaba cascade hydro plants considering monthly streamflow forecasting error

被引:45
作者
Xie, Mengfei
Zhou, Jianzhong [1 ]
Li, Chunlong
Zhu, Shuang
机构
[1] Huazhong Univ Sci & Technol, Sch Hydropower & Informat Engn, Wuhan 430074, Peoples R China
关键词
Long-term hydro generation scheduling; Monthly streamflow forecasting error; Monte Carlo simulation; Improved parallel progressive optimality algorithm; Forecasting dispatching chart; OPTIMAL OPERATION; OPTIMIZATION; STATIONS; RIVER; PREDICTION; 3-GORGE; SYSTEM; RULES; MODEL;
D O I
10.1016/j.enconman.2015.08.009
中图分类号
O414.1 [热力学];
学科分类号
摘要
Reliable streamflow forecasts are very significant for reservoir operation and hydropower generation. But for monthly streamflow forecasting, the forecasting result is unreliable and it is hard to be utilized, although it has a certain reference value for long-term hydro generation scheduling. Current researches mainly focus on deterministic scheduling, and few of them consider the uncertainties. So this paper considers the forecasting error which exists in monthly streamflow forecasting and proposes a new long-term hydro generation scheduling method called forecasting dispatching chart for Xiluodu and Xiangjiaba cascade hydro plants. First, in order to consider the uncertainties of inflow, Monte Carlo simulation is employed to generate streamflow data according to the forecasting value and error distribution curves. Then the large amount of data obtained by Monte Carlo simulation is used as inputs for long-term hydro generation scheduling model. Because of the large amount of streamflow data the computation speed of conventional algorithm cannot meet the demand. So an improved parallel progressive optimality algorithm is proposed to solve the long-term hydro generation scheduling problem and a series of solutions are obtained. These solutions constitute an interval set, unlike the unique solution in the traditional deterministic long-term hydro generation scheduling. At last, the confidence intervals of the solutions are calculated and forecasting dispatching chart is proposed as a new-method for long-term hydro generation scheduling. A set of rules are proposed corresponding to forecasting dispatching chart. The chart is tested for practical operations and achieves good performance. (C) 2015 Elsevier Ltd. All rights reserved.
引用
收藏
页码:368 / 376
页数:9
相关论文
共 37 条
[1]   Comparison of performance of statistical models in forecasting monthly streamflow of Kizil River, China [J].
Abudu, Shalamu ;
Cui, Chun-liang ;
King, James Phillip ;
Abudukadeer, Kaiser .
WATER SCIENCE AND ENGINEERING, 2010, 3 (03) :269-281
[2]   Long- term management of a hydroelectric multireservoir system under uncertainty using the progressive hedging algorithm [J].
Carpentier, P. -L. ;
Gendreau, M. ;
Bastin, F. .
WATER RESOURCES RESEARCH, 2013, 49 (05) :2812-2827
[3]   Research on a layered coupling optimal operation model of the Three Gorges and Gezhouba cascade hydropower stations [J].
Chen, Juan ;
Zhong, Ping-an ;
Zhao, Yun-fa .
ENERGY CONVERSION AND MANAGEMENT, 2014, 86 :756-763
[4]   Comparison of particle swarm optimization and dynamic programming for large scale hydro unit load dispatch [J].
Cheng, Chun-tian ;
Liao, Sheng-li ;
Tang, Zi-Tian ;
Zhao, Ming-yan .
ENERGY CONVERSION AND MANAGEMENT, 2009, 50 (12) :3007-3014
[5]   Short-Term Hydroscheduling with Discrepant Objectives Using Multi-Step Progressive Optimality Algorithm [J].
Cheng, Chuntian ;
Shen, Jianjian ;
Wu, Xinyu ;
Chau, Kwok-wing .
JOURNAL OF THE AMERICAN WATER RESOURCES ASSOCIATION, 2012, 48 (03) :464-479
[6]   Short-Term Scheduling for Large-Scale Cascaded Hydropower Systems with Multivibration Zones of High Head [J].
Cheng, Chuntian ;
Shen, Jianjian ;
Wu, Xinyu .
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2012, 138 (03) :257-267
[7]  
Cheng CT, 2005, LECT NOTES COMPUT SC, V3498, P1040
[8]   A computational study of a stochastic optimization model for long term hydrothermal scheduling [J].
de Matos, Vitor Luiz ;
Finardi, Erlon Cristian .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2012, 43 (01) :1443-1452
[9]   Parallel computing applied to the stochastic dynamic programming for long term operation planning of hydrothermal power systems [J].
Dias, Bruno Henriques ;
Tomim, Marcelo Aroca ;
Marques Marcato, Andre Luis ;
Ramos, Tales Pulinho ;
Brandi, Rafael Bruno S. ;
da Silva Junior, Ivo Chaves ;
Passos Filho, Joao Alberto .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2013, 229 (01) :212-222
[10]   NEW ALGORITHM FOR SOLUTION OF MULTISTATE DYNAMIC-PROGRAMMING PROBLEMS [J].
HOWSON, HR ;
SANCHO, NGF .
MATHEMATICAL PROGRAMMING, 1975, 8 (01) :104-116