Evaluation on Bearing Capacity Improvement of Cast-in-situ Bored piles Using Post-grouting Technology

被引:1
作者
Cai, Jing [1 ]
Wang, Yongyu [1 ]
Wang, Xinghua [2 ]
Yan, Huawei [1 ]
机构
[1] Cival Aviat Univ China, Tianjin 300300, Peoples R China
[2] Shou Guang Kai Bao Huang Co Ltd, Shou Guang 262702, Peoples R China
来源
PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5 | 2012年 / 204-208卷
关键词
cast-in-situ bored pile; post-grouting technology; ultimate bearing capacity; economic benefit;
D O I
10.4028/www.scientific.net/AMM.204-208.168
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Post-grouting technology is an effective method of improving mud cake in the pile tip and debris in the pile side. What's more, it is also considered as a great method to improve the bearing capacity of the cast-in-situ bored pile. The post-grouting technology is used in the foundation of a tall office building in Shan Dong province. For this project, comparing results of the static load test and the theoretical calculation, some conclusions can be made that the bearing capacity of post-grouting pile is 126.5% more than that of unpost-grouting one, the ratio between the tip resistance and the side resistance of the post-grouting pile are 39.8% and 60.2% respectively, and the ratio between the tip resistance and the side resistance of the unpost-grouting pile are 28.9% and 71.1% respectively. It is estimated that the cost of cast-in-situ bored piles using post-grouting technology is 45%similar to 50% cheaper than the unpost-grouting piles.
引用
收藏
页码:168 / 172
页数:5
相关论文
共 7 条
[1]  
Chen Fan, 2003, DETECTION TECHNIQUE
[2]  
China Academy of Building Research, 2003, JGJ1062003 CHIN AC B
[3]  
China Academy of Building Research, 2008, JGJ942008 CHIN AC BU
[4]  
Ping Qi, 2009, BEARING CAPACITY RES
[5]  
Shi Peilong, 1999, PRACTICAL PROJECT MA
[6]  
Zhang H., 2001, DETECTION TREATMENT
[7]  
[周红波 Zhou Hongbo], 2005, [工业建筑, Industrial construction], V35, P60