Construction Resource Allocation and Leveling Using a Threshold Accepting-Based Hyperheuristic Algorithm

被引:37
作者
Koulinas, Georgios K. [1 ]
Anagnostopoulos, Konstantinos P. [1 ]
机构
[1] Democritus Univ Thrace, Sch Engn, Dept Prod & Management Engn, GR-67100 Xanthi, Greece
关键词
Resource allocation; Resource leveling; Optimization; Construction management; Scheduling; PARTICLE SWARM OPTIMIZATION; GENETIC ALGORITHM; PROJECTS;
D O I
10.1061/(ASCE)CO.1943-7862.0000492
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In this study we propose a threshold accepting based hyperheuristic for solving in a single run both the resource-constrained project scheduling problem or resource allocation, and the resource leveling problem. Having their roots in the field of artificial intelligence, hyperheuristics operate in the "low-level" heuristics domain rather than in the solutions domain. The hyperheuristic has been implemented within a commercial project management software package. Low-level heuristics operate on the solution domain defined by the priority values that the software uses for resource allocation. A case example from the literature and computational experiments on randomly generated projects demonstrate that the hyperheuristic achieves good performance in a timely manner, improving the results provided by the software. DOI: 10.1061/(ASCE)CO.1943-7862.0000492. (C) 2012 American Society of Civil Engineers.
引用
收藏
页码:854 / 863
页数:10
相关论文
共 48 条
[1]  
Ahuja H.N., 1976, Construction Performance Control by Networks
[2]   Resource-Constrained Critical Path Scheduling by a GRASP-Based Hyperheuristic [J].
Anagnostopoulos, Konstantinos ;
Koulinas, Georgios .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2012, 26 (02) :204-213
[3]   A simulated annealing hyperheuristic for construction resource levelling [J].
Anagnostopoulos, Konstantinos P. ;
Koulinas, Georgios K. .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2010, 28 (02) :163-175
[4]  
[Anonymous], 2008, ADAPTIVE MULTILEVEL, DOI DOI 10.1007/978-3-540-79438-7_1
[5]  
[Anonymous], ESSAYS SURVEYS METAH
[6]   OPTIMAL RESOURCE LEVELING USING NON-SERIAL DYNAMIC-PROGRAMMING [J].
BANDELLONI, M ;
TUCCI, M ;
RINALDI, R .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 78 (02) :162-177
[7]   Resource-constrained project scheduling by simulated annealing [J].
Boctor, FF .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (08) :2335-2351
[8]   SOME EFFICIENT MULTI-HEURISTIC PROCEDURES FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING [J].
BOCTOR, FF .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1990, 49 (01) :3-13
[9]   A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version [J].
Bouleimen, K ;
Lecocq, H .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 149 (02) :268-281
[10]   A branch and bound algorithm for the resource-constrained project scheduling problem [J].
Brucker, P ;
Knust, S ;
Schoo, A ;
Thiele, O .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 107 (02) :272-288