Reconstruction of the gland sealing system of a 300MW steam turbine unit

被引:0
|
作者
Xie, DM [1 ]
Liu, GL [1 ]
Wang, JM [1 ]
Yang, J [1 ]
机构
[1] Wuhan Univ, Power Engn Dept, Wuhan 430072, Hubei, Peoples R China
关键词
reconstruction; gland sealing system; steam leakage;
D O I
暂无
中图分类号
O414.1 [热力学];
学科分类号
摘要
This paper discusses the steam leakage of a 300MW steam turbine unit and its effect on the turbine's economy and efficiency by calculation in details. Then it introduces the measures used to deal with this problem at site.
引用
收藏
页码:862 / 866
页数:5
相关论文
共 50 条
  • [31] Study on Steam-Water Auxiliary System Dynamic Characteristics of a 300MW Oxygen Combustion Boiler
    Tong, Peng
    Wang, Ning
    Sun, Shaodong
    Gao, Jianqiang
    INTERNATIONAL CONFERENCE ON NEW ENERGY AND RENEWABLE RESOURCES (ICNERR 2015), 2015, : 444 - 448
  • [32] Forced Compressed Air Cooling System for a 300 MW Steam Turbine in Waigaoqiao Power Plant
    Sun Shixiong Hua Hong Shanghai Waigaoqiao Thermal Power Plant
    Electricity, 1996, (04) : 22 - 24
  • [33] Some trouble spots of the steam turbine powered feedwater pump of a 300 MW unit and measures taken for their resolution
    Fu, Xue-bin
    Chi, Wei
    Ma, Jingdong
    Liu, Zhi-lie
    Lu, Yan-fu
    Kong, Qing-wu
    Yu, Chang-qi
    Reneng Dongli Gongcheng/Journal of Engineering for Thermal Energy and Power, 2000, 15 (06): : 685 - 686
  • [34] Modification Research on the Tube Layout of One 300MW Unit Condenser
    Cheng, Qi
    Zhang, Li
    Wu, Yinjun
    ENERGY DEVELOPMENT, PTS 1-4, 2014, 860-863 : 1436 - 1440
  • [35] Experimental Study on Optimized Adjustment of Ammonia Spraying in 300MW Unit
    Liu, Bo
    Zhang, Peng
    Li, Sha
    Wei, Hongge
    Zhu, Yue
    2ND INTERNATIONAL CONFERENCE ON AIR POLLUTION AND ENVIRONMENTAL ENGINEERING, 2020, 450
  • [36] Experience introduction of Heze power plant 300MW unit CCS
    Hou, DL
    Hu, HP
    Lü, SL
    Proceedings of the World Engineers' Convention 2004, Vol F-B, Power and Energy, 2004, : 139 - 145
  • [37] INFORMATION SYSTEM FOR CONTROL OF A 200 MW UNIT-TYPE STEAM TURBINE-GAS TURBINE PLANT
    SHORNIKOV, EA
    TINKER, EM
    SOSINOVICH, VA
    THERMAL ENGINEERING, 1969, 16 (11) : 29 - +
  • [38] Sealing oil system faults and its counter measures of domestically-made imported type 300MW generators
    Lu, Jikui
    Zhongguo Dianli/Electric Power, 31 (03): : 45 - 43
  • [39] Modelling of nuclear auxiliary system of Full Scope Simulator for Qinshan 300MW Nuclear Power Unit
    Asia Simulation & Control System, Engineering Corp, Zhuhai, China
    Hedongli Gongcheng, 2 (141-146):
  • [40] Selection of ultra-low emission transformation scheme for 300MW CFB unit desulphurization system
    Zhang, Lei
    Yuan, Guangcun
    Li, Shuyuan
    THIRD INTERNATIONAL CONFERENCE ON ENERGY ENGINEERING AND ENVIRONMENTAL PROTECTION, 2019, 227