- [1] Reconstruction and analysis on gland sealing system of 300 MW steam turbine 2002, Harbin Steam Turbine Company (44):
- [2] Assessing the flaws in welded seam of header of a 300MW steam turbine generator unit ENGINEERING PLASTICITY AND ITS APPLICATIONS FROM NANOSCALE TO MACROSCALE, PTS 1 AND 2, 2007, 340-341 : 1431 - +
- [3] Retrofit of electro-hydraulic governing system of 300MW steam turbine Zhongguo Dianli/Electric Power, 2003, 36 (10):
- [4] Testing and research of shaft sealing system of indigenous imported type 300 MW steam turbine Zhongguo Dianli/Electric Power, 2000, 33 (07): : 14 - 16
- [5] Analysis of the 300MW steam turbine rotor's transient temperature Qilunji Jishu/Turbine Technology, 2003, 45 (05):
- [6] Economics Analysis of Retrofit of Flow Passage of a 300MW Steam Turbine 2011 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2011,
- [7] IP Start-up Control for 300MW Turbine Unit with Bypass System INTERNATIONAL WORKSHOP ON AUTOMOBILE, POWER AND ENERGY ENGINEERING, 2011, 16
- [8] Design features of a 300MW nuclear power plant steam turbine Dongli Gongcheng/Power Engineering, 1988, 8 (06): : 1 - 7
- [9] On effective rapid startup of 300 MW steam turbine unit PROCEEDINGS OF THE 32ND 2020 CHINESE CONTROL AND DECISION CONFERENCE (CCDC 2020), 2020, : 803 - 808
- [10] Turbine and its control system of full scope simulator for Qinshan 300MW Nuclear Power Unit Hedongli Gongcheng, 2 (168-174):